FRAM833/23
Details
- Supplier(s)
- 22live Limited
- Value
- £40,003.8
- Topic
- Lighting systems
- Published
- 21 February 2024
- Source
- uk:find_a_tender
Tender description
The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall. The University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots: • Lot 1 - PA System • Lot 2 - Mixing Console & Stage Boxes • Lot 3 - Lighting Systems Lot 1: PA System Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. For the PA System, the University currently owns a stock of various D&B Audiotechnik speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for front/side/foldback fills as required, and a small stock of monitor wedges (M6). Any system design will need to integrate with the above existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024. Lot 2: Mixing Console & Stage Boxes Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via Dante. We require any console supplied to be compatible with the existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024. Lot 3: Lighting System Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The profile fixtures which the University currently owns are ETC Source 4's, and any replacement fixtures supplied must retain compatibility with our current lens stock. Please note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall as compatibility with our current stage and control room panels may or may not be possible depending on the solutions offered. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.
Timeline
- Completed: Award date17 November 2023
- Completed: Award published21 February 2024Current notice
About the buyer
University of Birmingham is a higher education organisation whose central Procurement Division buys on behalf of its colleges, departments and professional services. Framework agreements arranged through regional consortia set fixed terms, service levels and pricing, and a purchase is committed only once an order is placed. The University also runs its own Build Higher Framework for construction projects, appointing five approved contractors to deliver against it. Suppliers register on the University's in-tend portal to view and respond to live tenders. Sustainable procurement principles apply across all University purchasing, covering carbon reduction and ethical supply chains.
Education procurement reached £47.4bn in 2024/25, the fourth-largest public sector budget.
Over the past 5 years, most of University of Birmingham's contract awards have been in business services, software and information systems and research and development.
Relevant CPV codes
- 31527260 · Lighting systems
- 32321200 · Audio-visual equipment
- 32342420 · Studio mixing console
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@university-of-birmingham.gov |
24 similar open tenders
See more open tenders related to FRAM833/23.
- Open tender
WCCC26 435 Public Lighting Maintenance
- Open tender
Menin Gate Soundscape
Related buyers
Buyers similar to University of Birmingham.
- 427£29.5m
- 327£342.4m
- 157£192.8m
- 143£20.1m
- 136£360.7m
- 134£95.9m
- 125£29.3m
- 119£47.9m
- 111£22.6m
- 93£18.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
