Nantycreiau Culvert Repairs
Details
- Supplier(s)
- Midwest Plant Limited
- Duration
- 4 months
- Topic
- Environmental protection
- Published
- 10 February 2026
- Source
- uk:find_a_tender
Tender description
The works are required to protect the integrity of the scour protection works and avoid further sediment loss to the watercourse asset should the culvert collapse or lead to channel blockage. Site inspections carried out by the original scour protection contractor and MRA engineers suggest that during the storm, water backed up in the culvert, overtopped the headwall, and flowed over the adjacent path into the channel. This overflow has caused a washout of fine soils around the existing metal pipe at the outfall, further compromising the stability of the culvert. In recent months a deterioration has been noted in that a new hole has been discovered in the culvert and this has lead to Natural Resources Wales (NRW) / Cyfoeth Naturiol Cymru flagging this situation as a pollution incident. Complete collapse would likely result in all of the polluted legacy mining spoil, from above and surrounding the culvert, washing down the watercourse. ## Contract award
Timeline
- Completed: Award published10 February 2026Current notice
- Completed: Award date10 February 2026
- Completed: Contract expiry date31 May 2026
About the buyer
The Mining Remediation Authority manages the legacy of historical mining across Great Britain as a public body sponsored by the Department for Energy Security and Net Zero. Suppliers are sourced through Crown Commercial Service frameworks and competitive tender on the open market. Single-tender and restricted contracts stay limited and exceptional, with exceptions reported quarterly to DESNZ. Emergency call-out and minor civil engineering works are called off through a dedicated NEC4 framework.
Over the past 5 years, most of the Mining Remediation Authority's contract awards have been in construction work, metals and mining products and architectural and engineering services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov |
11 similar open tenders
See more open tenders related to Environmental protection.
- Open tender
Habitat Regulations Assessment
- Open tender
Consultancy and Professional Services
Related topics
Topics related to Nantycreiau Culvert Repairs, ranked by notice volume.
- 14,286£1.1tn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.