T23-070CAP Acorn Farm Project Contractors PQQ Application
Details
- Supplier(s)
- RJ McKelvey Ltd
- Value
- £4,744,136.07
- Topic
- Works for complete or part construction and civil engineering work
- Published
- 29 February 2024
- Source
- uk:find_a_tender
Tender description
Acorn Farm is a walled brownfield site located on a vacant plot of land within St Columb’s Park off St. Columb’s Road opposite the former Ebrington Barracks site in Derry/ Londonderry. Acorn Farm is approximately 0.874 hectares in area. The site is in a predominately residential and commercial area and access to the site can be gained from St Columb’s Road (South). The site is bounded by St. Columb’s Road to south and by St. Columb’s Park on all other sides. The site was formerly used as accommodation for the RUC and a helicopter pad serving the barracks. Ebrington Barracks was closed in 2003. Site clearance and ground levelling work was completed in 2022 as part of site enabling works. The Council has completed works to remove vegetation, hardstandings, concrete bases, steps, retaining walls and redundant underground services across the site and the ground flattened to an even gradient. Although, the council cannot rule out the possibility that some buried infrastructure might have been missed during this pre-commencement site clearance contract. Trees remain along the southern boundary along with the boundary walls, manholes along with northern edge and piles of crushed hardcore and compost. The overall aim of the Acorn Farm project is to transform a former MOD derelict site into a growing space as a centre of Permaculture excellence in the Northwest City Region. The Acorn Project will facilitate the development of new food growing technologies and to deliver a capital project which is an exemplar as a climate smart net zero/nearly zero carbon project, incorporating the use of circular economy principles, sustainable energy and energy/resource efficient technologies. Derry City and Strabane District Council (DCSDC) has developed a Climate Change Adaptation Plan (2020) and a Climate Change Emergency Pledge (2020) outlining the Council's climate action commitments, including a shift to net zero greenhouse gas emissions and climate resilience across the city and district by 2045. The ambition for the Acorn Farm site including the buildings, external works and landscape is to achieve climate resilience and whole life net zero emissions or nearly net zero emissions. The project is for the provision of a community enterprise to provide a unique urban growing space within the City. Please refer to CfT documents for further information. Addendum 1 is PQQ, Addendums 2-10 incl are draft ITT Documents Lot 1: Acorn Farm is a walled brownfield site located on a vacant plot of land within St Columb’s Park off St. Columb’s Road opposite the former Ebrington Barracks site in Derry/ Londonderry. Acorn Farm is approximately 0.874 hectares in area. The site is in a predominately residential and commercial area and access to the site can be gained from St Columb’s Road (South). The site is bounded by St. Columb’s Road to south and by St. Columb’s Park on all other sides. The site was formerly used as accommodation for the RUC and a helicopter pad serving the barracks. Ebrington Barracks was closed in 2003. Site clearance and ground levelling work was completed in 2022 as part of site enabling works. The Council has completed works to remove vegetation, hardstandings, concrete bases, steps, retaining walls and redundant underground services across the site and the ground flattened to an even gradient. Although, the council cannot rule out the possibility that some buried infrastructure might have been missed during this pre-commencement site clearance contract. Trees remain along the southern boundary along with the boundary walls, manholes along with northern edge and piles of crushed hardcore and compost. The overall aim of the Acorn Farm project is to transform a former MOD derelict site into a growing space as a centre of Permaculture excellence in the Northwest City Region. The Acorn Project will facilitate the development of new food growing technologies and to deliver a capital project which is an exemplar as a climate smart net zero/nearly zero carbon project, incorporating the use of circular economy principles, sustainable energy and energy/resource efficient technologies. Derry City and Strabane District Council (DCSDC) has developed a Climate Change Adaptation Plan (2020) and a Climate Change Emergency Pledge (2020) outlining the Council's climate action commitments, including a shift to net zero greenhouse gas emissions and climate resilience across the city and district by 2045. The ambition for the Acorn Farm site including the buildings, external works and landscape is to achieve climate resilience and whole life net zero emissions or nearly net zero emissions. The project is for the provision of a community enterprise to provide a unique urban growing space within the City. Please refer to CfT documents for further information. Addendum 1 is PQQ, Addendums 2-10 incl are draft ITT Documents
Timeline
- Completed: Award date6 February 2024
- Completed: Award published29 February 2024Current notice
About the buyer
Derry City & Strabane District Council is a local authority covering the Derry and Strabane district in Northern Ireland, running its own procurement function. Tenders are published through eTendersNI, the shared eProcurement portal for Northern Ireland's public bodies. Contracts are grouped by department, spanning environment, business, health and community, capital and corporate categories. Complex procurements often open with a preliminary market engagement questionnaire ahead of the full tender. Bids typically close at 12 noon on a specified Friday, set out on each notice. The council's own website also mirrors live and past tenders alongside the portal.
UK local government drives £140bn in annual procurement, led by social protection (£66.6bn) and education (£57.1bn).
Over the past 5 years, most of Derry City & Strabane District Council's contract awards have been in construction work, architectural and engineering services and business services.
Relevant CPV codes
- 45200000 · Works for complete or part construction and civil engineering work
- 45210000 · Building construction work
- 45212000 · Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
- 45220000 · Engineering works and construction works
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov |
193 similar open tenders
See more open tenders related to T23-070CAP Acorn Farm Project Contractors PQQ Application.
- Open tender
DCWW 2113 - Low Value Small Works
- Open tender
PRO005183-Works-Framework-Power Resilience
- Open tender
Grimsby Dock Tower Restoration
- Open tender
General Building and Repair Works Framework
Related topics
Topics related to T23-070CAP Acorn Farm Project Contractors PQQ Application, ranked by notice volume.
- 9,103£759.1bn
- 14,524£1.1tn
- 54,808£5.5tn
- 2,792£691.7bn
- 11,479£1.0tn
- 32,396£2.0tn
Related buyers
Buyers similar to Derry City & Strabane District Council.
- 444£150.7m
- 203£32.2m
- 165£4.1bn
- 120£140.4m
- 84£95.7m
- 51£4.3m
- 50£5.7m
- 23£18.9m
- 5£1.2m
- 1,591£17.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.