Open tenderClosing in 1 month

Multi-Party Framework of Work Contractors for delivery of road infrastructure associated with Housing Activation in County Wexford Initial Project Ballynagee Link Road, Wexford Town

Details

Value
€60,000,000
Topic
Engineering works and construction works
Published
27 November 2026
Submission
11 January 2027in 1 month

Tender description

FRAMEWORK: It is envisaged that during the lifetime of the framework, there will be a number of Works Contracts for the delivery of road infrastructure associated with Housing Activation in County Wexford. Potential contracts include (but are not limited to): - Ballynage Link Road, Wexford Town - Circa 1.3km - Turrets Rock, Enniscorthy - Circa 0.4km - Milehouse to Moyne, Enniscorthy - Circa 2km - and any other similar projects that arise during the lifetime of the Framework WCC reserves the right to procure works for these and other similar works contract using separate procurement processes if so desired. The Framework Agreements will be issued for a term of four (4) years (“the Term”). It is envisaged that the maximum cumulative value of contracts awarded during the lifetime of the framework is €60m excluding VAT. WCC shall be entitled to terminate the Framework Agreement in the event that a Framework Agreement for Works Contractors is put in place by the Office of Government Procurement during the term of the Framework Agreement and in the case of such termination no compensation shall be payable for any loss (including consequential loss) that may be suffered by a Tenderer as a result of such termination INITIAL CONTRACT - BALLYNAGEE LINK ROAD The proposed development will comprise a new suburban link road, approximately 1.3km in length, connecting the L3016 Starvehall Road (Whiterock Hill) to the southern arm of the existing Ballynagee/ Scholars Way roundabout, located south of the R733 in the townland of Ballynagee, Wexford. The initial works contract comprises of: •A new single carriageway road with footpaths and segregated off-road cycle tracks on both sides. Approximately 6.5m wide carriageway consisting of two 3.25m wide traffic lanes, a 2m wide cycle track, a 2m wide footpath and varying widths of verges and rain gardens. •Junctions providing access to individual zoned land parcels, Loreto Secondary School, connection to Ballynagee/ Scholars Way roundabout, and to the L3016 Starvehall Road (Whiterock Hill); •Pedestrian zebra crossing on a raised table with tactile paving and cycle crossings at junctions and other key locations; •Two bus lay-bys adjacent to Loreto Secondary School; •An attenuation pond within the Min Ryan Park; •Culverts for existing stream/ land drains, including associated stream realignment works; •Surface water drainage infrastructure, including Sustainable Drainage Systems (SuDS) and rain garden features; •Watermain and foul sewer infrastructure to facilitate future development lands; •ESB infrastructure to facilitate future development lands; •Telecommunications infrastructure to facilitate future development lands; •Energy efficient public lighting and miscellaneous utility ducting; •Traffic signage and road markings; •Landscaping works and any boundary treatments; and •Accommodation works such as provision of environmental noise barriers, field entrances, cattle over/ under passes as may be agreed at the detailed design stage. •Any other works as may be required.

Timeline

  1. TenderThis notice (current page)
    Published
    27 Nov 2026
    Deadline
    11 Jan 2027

Engaging once a tender is open is late: the winners shaped it before it was published. Find my next tender early

About the buyer

Wexford County Council is an Irish local authority based at County Hall in Carricklawn, Wexford, and buys as a local government organisation. Its Procurement Unit sits at Block F in Carricklawn. Recent frameworks cover housing maintenance and macadam works.

SupplyGov lets local authorities run mini-competitions from central frameworks.

Over the past 5 years, most of Wexford County Council's contract awards have been in construction work, architectural and engineering services and repair and maintenance.

AI insights

  • What are the buyer's pain points?
  • Is there a preferred supplier?
  • What does the buyer typically spend?
  • What was the route to market?

Related topics

Topics related to Multi-Party Framework of Work Contractors for delivery of road infrastructure associated with Housing Activation in County Wexford Initial Project Ballynagee Link Road, Wexford Town, ranked by notice volume.

View all topics

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.