EKFB are delivering civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB are seeking to appoint a sub-contractor undertake the construction of 4 green tunnel portal building as detailed below: The buildings are to accommodate the mechanical, electrical, and communication equipment for operation of the tunnel. There will be a total of four portal buildings which are expected to have identical specifications and dimensions. Each building will be 50m length and a 15m width. See general arrangement. The buildings are situated at each end of the tunnels, which are located at Chipping Warden & Greatworth. Ground works and concrete slab will be carried out by EKFB, so this package is for all works above concrete slab and include but not limited to: • Steelwork • Cladding & Roofing • Internal fit out - ie. blockwork, partitions, plastering, painting, fire stopping, joinery • Mechanical & Electrical works ie, natural ventilation system , general mechanical heat recovery ventilation system, temperature control ventilation system, mechanical cooling system, electrical heating system, building management system, automatic monitoring & control, fire detection & alarm, fire hydrant system ,uninterrupted power system, cable management system, gas suppression system, normal & emergency lighting, power supply system, distribution for lighting, small power, emergency lighting, mechanical cooling and heating system, distribution for communication and other essential services • Landscaping Work
Timeline
- Completed: Tender published21 February 2024Current notice
- Completed: Submission date28 February 2024
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Contracts above the public procurement threshold are advertised on Find a Tender, and smaller awards appear on Contracts Finder. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain. Live subcontract opportunities are advertised through the CompeteFor portal.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Relevant CPV codes
- 45210000 · Building construction work
- 45213000 · Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
- 45213200 · Construction work for warehouses and industrial buildings
- 45213250 · Construction work for industrial buildings
- 45213300 · Buildings associated with transport
- 45213320 · Construction work for buildings relating to railway transport
- 45213350 · Construction work for buildings relating to various means of transport
- 45315000 · Electrical installation work of heating and other electrical building-equipment
- 45351000 · Mechanical engineering installation works
- 51100000 · Installation services of electrical and mechanical equipment
- 51120000 · Installation services of mechanical equipment
- 71333000 · Mechanical engineering services
- 71334000 · Mechanical and electrical engineering services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
192 similar open tenders
See more open tenders related to EKFB - Green Tunnel Portal Buildings.
- Open tender
DCWW 2113 - Low Value Small Works
- Open tender
Grimsby Dock Tower Restoration
- Open tender
General Building and Repair Works Framework
Related topics
Topics related to EKFB - Green Tunnel Portal Buildings, ranked by notice volume.
- 14,524£1.1tn
- 3,828£380.8bn
- 54,807£5.5tn
- 24,660£1.7tn
- 2,416£46.3bn
- 7,314£421.9bn
- 3,684£1.3tn
- 2,396£243.3bn
- 2,605£1.2tn
- 23,783£1.8tn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 3,054£1.8bn
- 1,200£14.2bn
- 802£8.9bn
- 551£22.8bn
- 485£3.8bn
- 426£24.7m
- 374£413.7m
- 300£335.8m
- 293£10.2bn
- 272£693.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.