Tender description
The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover. The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme. The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review. The timescales are as follows: The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: • 40 weeks for the preferred rainscreen and Safe RAD solution. • 46 weeks for the 275 mm precast fallback solution. The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.
Timeline
- Completed: Tender published19 November 2026Current notice
- Next: Submission date25 November 2026in 6 days
Engaging once a tender is open is late: the winners shaped it before it was published. Find my next tender early
About the buyer
Sizewell C Limited is the company building Sizewell C, a new nuclear power station in Suffolk. Some packages run in two stages, a pre-qualification questionnaire followed by an invitation to tender. Several packages open with an expression of interest before any tender is issued. The Sizewell C supply chain team monitors the platform and alerts suitable businesses to new tenders.
Over the past 5 years, most of Sizewell C Limited's contract awards have been in construction work, industrial machinery and architectural and engineering services.
120 similar open tenders
See more open tenders related to Building construction work.
- Open tender
London Cable Car Customer Enhancements
Related topics
Topics related to SZC CWA - Pool Bunker Construction, ranked by notice volume.
- 1,359£115.5bn
- 5,375£413.6bn
- 1,743£64.0bn
- 39,021£6.0tn
- 1,105£170.5bn
- 2,780£331.0bn
Related buyers
Buyers similar to Sizewell C Limited.
- 2,956£786.0m
- 1,670£172.0bn
- 1,624£55.5bn
- 1,604£17.0bn
- 1,423£1.6bn
- 1,204£13.9bn
- 1,000£1.8bn
- 989£2.3bn
- 980£3.5bn
- 833£740.3m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.