Awarded contract

Works for complete or part construction and civil engineering work

Details

Supplier(s)
Duration
8 years
Topic
Construction machinery and equipment
Published
14 October 2019

Tender description

Thames Water are looking for a number of partners to help us achieve our aim of increasing the efficiency of slow sand filter beds and rapid gravity filters through effective repairs and refurbishments and good quality media. Please note that the scope of these agreements does not include the supply of granular activated carbon (GAC). We have split our requirements into lots: Lot 1: Media removal and replacement; Lot 2: Slow sand filter bed refurbishment; Lot 3: Floor blocks for slow sand filter beds; Lot 4: Slow sand filter media; Lot 5: Rapid gravity filter bed refurbishment; Lot 6: Rapid gravity filter media. Specifications for each lot are given in the procurement documents (draft ITN) along with some heads of terms although these are not yet finalised. Bidders can apply for more than one lot and can submit commercial bids for individual lots as well as variant bids for combined lots. More detail on commercial schedule completion will be given in the procurement documents. Successful suppliers under this lot will be responsible for the removal of media from the slow sand filter beds (before the refurbishment work begins) and the installation of media after the refurbishment work is complete. Note that this activity is also undertaken by in-house teams and this agreement would be used as additional capacity. Suppliers under this lot will need to work closely with both TW site personnel and the slow sand filter refurbishment suppliers in order to minimise the amount of time that the slow sand filter beds are out of action for. Suppliers will need to provide their own machinery for removing the media and GAC although they will not need to dispose of the media. There will be a designated area on each site for media storage until it is either replaced in the beds or disposed of. Note that this lot does not include the supply of any media. We aim to appoint a single supplier for this lot. The value below is an estimate, over the maximum term of the agreement, based on expected spend. Successful suppliers under this lot will be responsible for the removal of media from the slow sand filter beds (before the refurbishment work begins) and the installation of media after the refurbishment work is complete. Note that this activity is also undertaken by in-house teams and this agreement would be used as additional capacity. Suppliers under this lot will need to work closely with both TW site personnel and the slow sand filter refurbishment suppliers in order to minimise the amount of time that the slow sand filter beds are out of action for. Suppliers will need to provide their own machinery for removing the media and GAC although they will not need to dispose of the media. There will be a designated area on each site for media storage until it is either replaced in the beds or disposed of. Note that this lot does not include the supply of any media. We aim to appoint a single supplier for this lot. The value below is an estimate, over the maximum term of the agreement, based on expected spend. Successful suppliers under this lot will be responsible for the removal of media from the slow sand filter beds (before the refurbishment work begins) and the installation of media after the refurbishment work is complete. Note that this activity is also undertaken by in-house teams and this agreement would be used as additional capacity. Suppliers under this lot will need to work closely with both TW site personnel and the slow sand filter refurbishment suppliers in order to minimise the amount of time that the slow sand filter beds are out of action for. Suppliers will need to provide their own machinery for removing the media and GAC although they will not need to dispose of the media. There will be a designated area on each site for media storage until it is either replaced in the beds or disposed of. Note that this lot does not include the supply of any media. We aim to appoint a single supplier for this lot. The value below is an estimate, over the maximum term of the agreement, based on expected spend. Successful suppliers under this lot will be responsible for the removal of media from the slow sand filter beds (before the refurbishment work begins) and the installation of media after the refurbishment work is complete. Note that this activity is also undertaken by in-house teams and this agreement would be used as additional capacity. Suppliers under this lot will need to work closely with both TW site personnel and the slow sand filter refurbishment suppliers in order to minimise the amount of time that the slow sand filter beds are out of action for. Suppliers will need to provide their own machinery for removing the media and GAC although they will not need to dispose of the media. There will be a designated area on each site for media storage until it is either replaced in the beds or disposed of. Note that this lot does not include the supply of any media. We aim to appoint a single supplier for this lot. The value below is an estimate, over the maximum term of the agreement, based on expected spend. Successful suppliers under this lot will be responsible for the removal of media from the slow sand filter beds (before the refurbishment work begins) and the installation of media after the refurbishment work is complete. Note that this activity is also undertaken by in-house teams and this agreement would be used as additional capacity. Suppliers under this lot will need to work closely with both TW site personnel and the slow sand filter refurbishment suppliers in order to minimise the amount of time that the slow sand filter beds are out of action for. Suppliers will need to provide their own machinery for removing the media and GAC although they will not need to dispose of the media. There will be a designated area on each site for media storage until it is either replaced in the beds or disposed of. Note that this lot does not include the supply of any media. We aim to appoint a single supplier for this lot. The value below is an estimate, over the maximum term of the agreement, based on expected spend. Successful suppliers under this lot will be responsible for the removal of media from the slow sand filter beds (before the refurbishment work begins) and the installation of media after the refurbishment work is complete. Note that this activity is also undertaken by in-house teams and this agreement would be used as additional capacity. Suppliers under this lot will need to work closely with both TW site personnel and the slow sand filter refurbishment suppliers in order to minimise the amount of time that the slow sand filter beds are out of action for. Suppliers will need to provide their own machinery for removing the media and GAC although they will not need to dispose of the media. There will be a designated area on each site for media storage until it is either replaced in the beds or disposed of. Note that this lot does not include the supply of any media. We aim to appoint a single supplier for this lot. The value below is an estimate, over the maximum term of the agreement, based on expected spend.

Timeline

  1. Completed: Award date28 August 2019
  2. Completed: Award published14 October 2019
    Current notice
  3. Next: Contract expiry date17 July 2027in 8 months

About the buyer

Thames Water Utilities Limited buys as a utility, through a Procurement Support Centre in Reading. Thames Water operates in a regulated industry, so becoming a supply partner follows a formal structure. Suppliers email the procurement team with the notice reference to take part in a tender. Suppliers can bid for water resources, demand management or leakage solutions through the Bid Assessment Framework. Innovative ideas can also be submitted through an online form.

Over the past 5 years, most of Thames Water Utilities Limited's contract awards have been in construction work, IT services and waste, cleaning and environmental services.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

82 similar open tenders

See more open tenders related to Construction machinery and equipment.

Explore all open tenders

Related topics

Topics related to Works for complete or part construction and civil engineering work, ranked by notice volume.

View all topics

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.