Construction and commission of modular rig
Details
- Topic
- Construction work
- Published
- 9 February 2026
- Submission
- 20 February 2026
- Source
- uk:find_a_tender
Tender description
UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network 1. Project Overview UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. ________________________________________ 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network Installation Verification • Completion of installation checks against drawings and specifications • QA/QC inspections and documentation • Identification and resolution of defects or non-conformances • As-built documentation and redlining Inactive Commissioning • Mechanical completion checks • Pressure/leak testing (where applicable) • Functional checks (non-energised / non-process) • Safety and compliance verification • Handover documentation and commissioning packs ________________________________________ 3. Contractor Requirements Interested parties should demonstrate: • Experience assembling modular or multi-storey industrial/process rigs or plant • Experience working with multi-disciplinary service interfaces (gas, fluids, extraction, electrical) • Commissioning and mechanical completion experience • Strong health, safety, and quality management systems to comply with CDM regulations • Ability to work within an operational facility environment • Relevant certifications and competencies ________________________________________ 4. Deliverables The appointed contractor will be expected to provide: • Method statements and risk assessments • Installation and commissioning plans • Inspection and test records • Mechanical completion dossiers • As-built documentation • Handover pack ________________________________________ 5. Programme (Indicative) • Site readiness: June 2026 • Assembly period: 3 months • Handover to active commissioning: September 2026
Timeline
- Completed: Pre-tender published9 February 2026Current notice
About the buyer
National Nuclear Laboratory is the UK's national nuclear science and technology laboratory, and a Contracting Authority in its own right. Crown Commercial Service agreements also route work to suppliers. A university supply chain framework covers postdoctoral research, university consultancy and commercial research contracts. National Nuclear Laboratory is one of nine members of the Shared Services Alliance.
A pipeline of upcoming activities is published roughly every quarter.
Over the past 5 years, most of National Nuclear Laboratory Ltd's contract awards have been in laboratory and precision equipment, architectural and engineering services and research and development.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-nuclear-laboratory-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-nuclear-laboratory-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-nuclear-laboratory-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-nuclear-laboratory-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-nuclear-laboratory-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-nuclear-laboratory-ltd.gov |
303 similar open tenders
See more open tenders related to Construction work.
- Open tender
Stoke Road, Henlade
Related topics
Topics related to Construction and commission of modular rig, ranked by notice volume.
- 4,267£99.7bn
Related buyers
Buyers similar to National Nuclear Laboratory Ltd.
- 1,808£172.3bn
- 509£240.8m
- 445£6.2bn
- 408£112.0m
- 394£649.4m
- 324£1.2bn
- 321£24.6bn
- 259£3.1bn
- 150£1.0bn
- 127£1.6bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.