Open tenderClosing in 1 month

Boiler Room Upgrade at Kensington Palace

Details

Value
£325,000
Topic
Boiler installations
Published
13 November 2026
Submission
11 December 2026in 1 month

Tender description

The works are located within the Boiler Room serving the offices in apartments at Kensington Palace. The project comprises the replacement of the existing end-of-life atmospheric gas boilers with new high-efficiency condensing boilers, together with the installation of new hot water cylinders, associated pipework, valves and plate heat exchangers. The new heating system shall be designed to facilitate future connection to a heat network, which is currently being investigated through a joint RHPS/HRP feasibility study. The existing boiler flues, originally designed for atmospheric boilers, shall be surveyed and either replaced or relined as required to suit the new plant. The Contractor shall also assess the adequacy of the existing gas supply and undertake any necessary upgrades, including the replacement of obsolete mechanical gas drop safety valves with modern electrically operated solenoid valves. The works shall include, but not be limited to: •Removal and disposal of existing boilers, associated plant and redundant equipment. •Installation, testing and commissioning of new condensing boilers. •Installation of new hot water cylinders, plate heat exchangers, pipework, valves and associated ancillaries. •Survey, replacement and/or relining of existing flues as required. •Upgrades to the gas supply infrastructure where necessary. •Removal and replacement of all electrical installations and equipment required to serve the new plant. •Cleaning, flushing and dosing of the existing heating system to protect both the new plant and retained system components. •Replacement of all thermostatic radiator valves (TRVs) and lockshield valves. •Associated builders' work, making good and redecoration of the plant room upon completion of the works. •Testing, commissioning and provision of all relevant certification, operation and maintenance manuals, and handover documentation. The completed installation shall provide a significantly improved level of energy efficiency compared with the existing system while maintaining reliable heating and hot water services and enabling future integration with a district heat network.

Timeline

  1. Completed: Tender published13 November 2026
    Current notice
  2. Next: Submission date11 December 2026in 1 month

Engaging once a tender is open is late: the winners shaped it before it was published. Get a free pre-tender lead

About the buyer

The Royal Household runs its own Procurement Team, named as the contracting authority on its tender notices. One catering maintenance tender ran in two stages, a questionnaire then an invitation to tender. Main spending areas are property maintenance, digital services and the Royal Collection Trust.

Over the past 5 years, most of The Royal Household's contract awards have been in construction work, repair and maintenance, and transport equipment.

AI insights

  • What are the buyer's pain points?
  • Is there a preferred supplier?
  • What does the buyer typically spend?
  • What was the route to market?

13 similar open tenders

See more open tenders related to Boiler installations.

Explore all open tenders

Related topics

Topics related to Boiler Room Upgrade at Kensington Palace, ranked by notice volume.

View all topics

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.