Cwmystwyth Planning and Design
Details
- Value
- £421,540
- Duration
- 2 years
- Topic
- Technical planning services
- Published
- 20 January 2026
- Source
- uk:contracts_finder
Tender description
The principle, long term objective of the Cwmystwyth project is the reduction of metal loadings entering the Afon Ystwyth from the Cwmystwyth site. The proposed works aim to significantly reduce (by up to 50% immediately downstream) concentrations / loadings of dissolved lead and zinc in the Ystwyth, as well as a significant (but currently unquantifiable) reduction in the amount of fine grained, metal rich sediment newly entering the main river system through erosion of exposed spoil and in channel deposits at Cwmystwyth (and associated dissolved phase contamination from leaching). The works aim to directly improve a stretch, estimated at 7km, of the river downstream of Cwmystwyth. Project objectives are to: • Deliver water quality betterment in the receiving waterbody that will achieve wider environmental benefits. • Maintain and enhance the natural environment and the well-bring of the community. Helping to achieve NRW Well-Bring Objectives and Environment (Wales) Act duties. • Engage the community and internal and external stakeholders to deliver an acceptable solution. • Minimise impacts to ecology and heritage - the site has numerous high value and sensitive environmental receptors and has 5 formal environmental designations and linked hydraulically to three more designated sites.
Timeline
- Completed: Award date15 January 2026
- Completed: Award published20 January 2026Current notice
- Next: Contract expiry date31 December 2027in 14 months
About the buyer
The Mining Remediation Authority manages the legacy of historical mining across Great Britain as a public body sponsored by the Department for Energy Security and Net Zero. Suppliers are sourced through Crown Commercial Service frameworks and competitive tender on the open market. Single-tender and restricted contracts stay limited and exceptional, with exceptions reported quarterly to DESNZ. Emergency call-out and minor civil engineering works are called off through a dedicated NEC4 framework.
Over the past 5 years, most of the Mining Remediation Authority's contract awards have been in construction work, metals and mining products and architectural and engineering services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@mining-remediation-authority.gov |
5 similar open tenders
See more open tenders related to Technical planning services.
- Open tender
Neighbourhood Plan Consultancy Services
- Open tender
Refurbishment work
Related topics
Topics related to Cwmystwyth Planning and Design, ranked by notice volume.
- 558£17.4bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.