Pre-tender

Wemyss Metal Mine Works

Details

Topic
Construction work for dams, canals, irrigation channels and aqueducts
Published
21 September 2026
Submission
10 October 2026in 2 weeks

Tender description

These works will be delivered as part of the Wales Metal Mine Programme (WMMP) between NRW and the Mining Remediation Authority. This programme supports the Western Wales River Basin Management Plan (Western Wales River Basin Management Plan 2021 – 2027 which was published as a final plan in July 2022 (specifically measures CYM49 - Deliver metal (non-coal) mine water programme as identified under the Metal Mine Strategy for Wales and WW0031 - Continue to investigate mine water impact and develop remediation plans in accordance with the Metal Mines Strategy for Wales). This plan has a statutory function associated with the Water Framework Directive (The Water Environment (Water Framework Directive) (England and Wales) Regulations 2017). Works – Summer 2027 • Introduction of an Upper Storage/Attenuation Pond to reduce flows into Upper Mill Race Stream. This will include increasing the existing bund height and installing flow control infrastructure. Approx length 90 metres and approx. height 1.5 metres. • Bypass the circular collapse feature east of Glanville’s Shaft with new open channel. • Introduction of highway drainage system and filter drain to avoid runoff finding its way into the main spoil tip. • A new lined water channel with flow monitors from the public highway to the Nant Cwmnewydion, construing a new ford crossing and improving the existing ford crossing. Approx. length 95 metres.

Timeline

  1. Completed: Pre-tender published21 September 2026
    Current notice

About the buyer

The Mining Remediation Authority manages the legacy of historical mining across Great Britain as a public body sponsored by the Department for Energy Security and Net Zero. Contract opportunities are published on Find a Tender. Suppliers are sourced through Crown Commercial Service frameworks and competitive tender on the open market. Single-tender and restricted contracts stay limited and exceptional, with exceptions reported quarterly to DESNZ. Larger procurements need a strategy approved by DESNZ before work goes to market. Emergency call-out and minor civil engineering works are called off through a dedicated NEC4 framework.

£434bn was the total UK public sector procurement spend in FY 2025/26.

Over the past 5 years, most of the Mining Remediation Authority's contract awards have been in construction work, metals and mining products and architectural and engineering services.

Relevant CPV codes

  • 45247000 · Construction work for dams, canals, irrigation channels and aqueducts

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Wemyss Metal Mine Works, ranked by notice volume.

View all topics
TopicCountValue
  1. 4,422
    £257.4bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.