ANDBC Pre-Qualification Questionnaire - Provision of Integrated Consultancy Services for Urban Waterfront and Public Realm under Bangor Waterfront Redevelopment
Details
- Supplier(s)
- Aecom
- Value
- £1,268,500
- Topic
- Architectural design services
- Published
- 28 August 2026
- Source
- uk:find_a_tender
Tender description
Ards and North Down Borough Council seeks to appoint an Integrated Consultancy Team (ICT) to design, manage and deliver a transformational solution for the redevelopment of Bangor’s Urban Waterfront and Public Realm, from RIBA Stage 0 through to RIBA Stage 7. This project is one of five constituent projects included in the Bangor Waterfront Redevelopment programme, to help re-establish Bangor as a thriving City and prime visitor attraction in Northern Ireland. The Bangor Waterfront Redevelopment project is a tourism led regeneration scheme which has secured funding through the Belfast Region City Deal to turn Bangor into a ‘destination of choice’, as a place to live, work, visit, study and invest, through a series of interconnected developments and experiences along Bangor Waterfront. The services required under this contract are for the design and delivery of the Urban Waterfront and Public Realm Redevelopment project (Constituent Project 1 in the wider redevelopment programme). The Urban Waterfront and Public Realm Redevelopment project aims to transform a 2 mile stretch of waterfront in Bangor, to uplift, connect, and rejuvenate the entire waterfront route and provide a strong foundation for the seamless integration of the other four, interdependent constituent projects under the Bangor Waterfront Redevelopment Programme. The project site extends across five diverse Character Areas, each requiring its own site-specific, sensitive, and sustainable design response, to address existing deficiencies and unify the waterfront route through interconnected spaces, buildings, facilities, place making initiatives and public realm improvements. The site proposed for redevelopment, is located in Bangor, a large seaside City situated on the southern side of Belfast Lough and within the Belfast Metropolitan area. Bangor is the third largest urban development in Northern Ireland, with a catchment population of circa 170,000 persons within a 20-minute drive time and circa 475,000 persons within a 30-minute drive time. In May 2022, the town was awarded City status as part of the Queen’s Platinum Jubilee Celebrations. The redevelopment site extends across a 2 mile stretch of coastline in Bangor, County Down, between Skippingstone Beach to the west (near Pickie Fun Park) and Banks Lane, Ballyholme, to the east. The site is comprised of five key ‘Character Areas’ which are diverse in character, identity, topography, environment, activities, role and function. The identified Character Areas are Skippingstone (north of Pickie Fun Park), Bangor Marina and Harbour, Seacliff Road (including the Long Hole), Kingsland and Ballyholme Promenade and adjoining areas. The Character Areas described above collectively make up the site area proposed for the UWPR redevelopment. Lot 1: Ards and North Down Borough Council seeks to appoint an Integrated Consultancy Team (ICT) to design, manage and deliver a transformational solution for the redevelopment of Bangor’s Urban Waterfront and Public Realm, from RIBA Stage 0 through to RIBA Stage 7. This project is one of five constituent projects included in the Bangor Waterfront Redevelopment programme, to help re-establish Bangor as a thriving City and prime visitor attraction in Northern Ireland. The Bangor Waterfront Redevelopment project is a tourism led regeneration scheme which has secured funding through the Belfast Region City Deal to turn Bangor into a ‘destination of choice’, as a place to live, work, visit, study and invest, through a series of interconnected developments and experiences along Bangor Waterfront. The services required under this contract are for the design and delivery of the Urban Waterfront and Public Realm Redevelopment project (Constituent Project 1 in the wider redevelopment programme). The Urban Waterfront and Public Realm Redevelopment project aims to transform a 2 mile stretch of waterfront in Bangor, to uplift, connect, and rejuvenate the entire waterfront route and provide a strong foundation for the seamless integration of the other four, interdependent constituent projects under the Bangor Waterfront Redevelopment Programme. The project site extends across five diverse Character Areas, each requiring its own site-specific, sensitive, and sustainable design response, to address existing deficiencies and unify the waterfront route through interconnected spaces, buildings, facilities, place making initiatives and public realm improvements. The site proposed for redevelopment, is located in Bangor, a large seaside City situated on the southern side of Belfast Lough and within the Belfast Metropolitan area. Bangor is the third largest urban development in Northern Ireland, with a catchment population of circa 170,000 persons within a 20-minute drive time and circa 475,000 persons within a 30-minute drive time. In May 2022, the town was awarded City status as part of the Queen’s Platinum Jubilee Celebrations. The redevelopment site extends across a 2 mile stretch of coastline in Bangor, County Down, between Skippingstone Beach to the west (near Pickie Fun Park) and Banks Lane, Ballyholme, to the east. The site is comprised of five key ‘Character Areas’ which are diverse in character, identity, topography, environment, activities, role and function. The identified Character Areas are Skippingstone (north of Pickie Fun Park), Bangor Marina and Harbour, Seacliff Road (including the Long Hole), Kingsland and Ballyholme Promenade and adjoining areas. The Character Areas described above collectively make up the site area proposed for the UWPR redevelopment.
Timeline
- Completed: Award date27 August 2026
- Completed: Award published28 August 2026Current notice
About the buyer
Ards and North Down Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71220000 · Architectural design services
- 71230000 · Organisation of architectural design contests
- 71410000 · Urban planning services
- 71420000 · Landscape architectural services
- 71541000 · Construction project management services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@ards-and-north-down-borough-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@ards-and-north-down-borough-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@ards-and-north-down-borough-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@ards-and-north-down-borough-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@ards-and-north-down-borough-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@ards-and-north-down-borough-council.gov |
106 similar open tenders
See more open tenders related to ANDBC Pre-Qualification Questionnaire - Provision of Integrated Consultancy Services for Urban Waterfront and Public Realm under Bangor Waterfront Redevelopment.
- Open tender
DPS1 1424 - Elmar Road Allomtent Tree Works
- Open tender
DPS1 1418 - Highway Fell Trees
- Open tender
DPS1 1384 - Housing Tree Work
- Open tender
DPS1 1385 Tree Works
- Open tender
DPS1 1417 Tree Works
Related topics
Topics related to ANDBC Pre-Qualification Questionnaire - Provision of Integrated Consultancy Services for Urban Waterfront and Public Realm under Bangor Waterfront Redevelopment, ranked by notice volume.
- 11,460£1.0tn
- 27,610£1.8tn
Related buyers
Buyers similar to Ards and North Down Borough Council.
- 1,595£17.2bn
- 1,363£1.6bn
- 1,042£3.2bn
- 1,000£1.8bn
- 900£2.6bn
- 849£392.2m
- 841£936.2m
- 766£18.8bn
- 677£619.8m
- 666£2.6bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
