Awarded contract

A9(T) Tore Modelling

Details

Supplier(s)
WSP UK Limited
Value
£89,330.4
Topic
Planning systems
Published
29 July 2026

Tender description

Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor’s current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself. Lot 1: Background Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor’s current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Objective Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself. Scope of Services A suitably qualified consultant will be appointed to undertake the following tasks: 1. Modelling Methodology - Develop and agree a robust methodology to assess the proposed signalisation and the impacts of future development growth from the Black Isle. - Select and justify appropriate modelling software/tools that can be used to help demonstrate the impact of proposed signalisation, and future traffic growth to local residents. - Incorporate the impact of closing the right turn to Munlochy and other potential intermediate gaps on the A9. 2. Sensitivity Testing & Recommendations - Conduct sensitivity testing to reflect current and committed growth as outlined in the Local Development Plan. - Analyse modelling outputs to assess the impact of proposed mitigation measures and development growth on journey times and overall network performance. - Provide clear, evidence-based recommendations for next steps in the Tore and Black Isle Study.

Timeline

  1. Completed: Award date15 July 2026
  2. Completed: Award published29 July 2026
    Current notice

About the buyer

Transport Scotland is a central government agency of the Scottish Government and runs its own procurement. Collaborative frameworks from the Scottish Government, Scotland Excel and the Government Commercial Agency are used where appropriate. Appropriate staff must hold a suitable level of Delegated Purchasing Authority. Buying follows the Procurement Reform (Scotland) Act 2014 and the Public Contracts (Scotland) Regulations 2015.

Over the past 5 years, most of Transport Scotland's contract awards have been in architectural and engineering services, business services and IT services.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

63 similar open tenders

See more open tenders related to Planning systems.

Explore all open tenders

Related topics

Topics related to A9(T) Tore Modelling, ranked by notice volume.

View all topics

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.