Network Rail High Speed Buildings and Civils Minor Works Framework
Details
- Buyer
- Network Rail
- Topic
- Railway construction works
- Published
- 16 January 2026
- Source
- uk:find_a_tender
Tender description
Network Rail High Speed has put in place a number of frameworks to cover Buildings and Civils Minor Work Framework for CP4. Lot 1- Buildings: 1 Supplier Lot 2 - Civils: 1 Supplier CP4 covers the 5 year period from 1st April 2025 to 31st March 2030. The contract value is inclusive of estimated CPI increases over the contract duration and an allowance for change and risk contingency. Lot 1: Lot 1 - Buildings Lot 1 - Buildings Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal of parts of: • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies) • Light maintenance depots • Maintenance delivery units • Critical lineside buildings (signal boxes, route operating centres, relay rooms) • Non-critical lineside buildings • Supply chain operations sites • Car parks, footpaths, and hardstanding • Walls (boundary, retaining and acoustic barriers) • Drainage including culverts Lot 2: Lot 2 - Civils Lot 2 - Civils Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal of parts of: • Bridges (underbridges, overbridges, footbridges, external stairs) • Viaducts • Tunnels • Walls (boundary, retaining and acoustic barriers) • Drainage including culverts • Structures • Earthworks (soil embankments, soil cuttings, rock cuttings and associated drainage works) • Roadways • Fencing (boundary and security) • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)
Timeline
- Completed: Award date20 December 2025
- Completed: Award published16 January 2026Current notice
About the buyer
Network Rail runs a safe, efficient railway, and buys as a central public body split between a national Route Services team and its regional routes. Network Rail's latest spend reporting covers Control Period 7, the 2024-25 financial year.
Safety-critical work needs audited status on RISQS, the rail industry's supplier qualification scheme, before Network Rail contracts directly.
Over the past 5 years, most of Network Rail's contract awards have been in IT services, architectural and engineering services and construction work.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@network-rail.gov |
3 similar open tenders
See more open tenders related to Railway construction works.
Related topics
Topics related to Network Rail High Speed Buildings and Civils Minor Works Framework, ranked by notice volume.
- 3,501£229.6bn
- 14,355£1.1tn
- 55,591£5.5tn
Related buyers
Buyers similar to Network Rail.
- 1,772£172.4bn
- 509£244.2m
- 445£1.5bn
- 405£112.4m
- 400£2.0bn
- 324£1.2bn
- 246£3.1bn
- 150£1.0bn
- 129£1.6bn
- 123£551.3m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.