S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews
Details
- Supplier(s)
- AtkinsRéalis Jacobs Joint Venture
- Value
- £272,959.34
- Duration
- 3 years
- Topic
- Development consultancy services
- Published
- 3 July 2026
- Source
- uk:contracts_finder
Tender description
Barton High Level Bridge (BHLB) is an eighteen-span steel-concrete composite structure carrying the M60 over the Manchester Ship Canal. The original bridge, constructed in 1960, comprised two independent deck halves formed from four longitudinal composite girders each, separated by a central reserve joint and supported by reinforced concrete bank seat abutments and hollow-column piers. The bridge was later widened between 1986 and 1989 as part of the M63 improvement works, with new edge girders and an extended deck slab added on both sides. Pre-widening investigations identified slight alkali-aggregate reactivity (AAR) in the original concrete, prompting a change in design approach. Instead of creating monolithic widened piers, the new outer supports were redesigned as independent, free-standing hollow reinforced-concrete columns founded on separate piles and connected to the original piers via link-and-pin "Pin Bearings". This configuration allowed independent vertical behaviour while constraining lateral and longitudinal movement, with the understanding that long-term monitoring and periodic bearing adjustments would be required to manage differential movements.
Timeline
- Completed: Award date2 July 2026
- Completed: Award published3 July 2026Current notice
- Next: Contract expiry date31 March 2029in 3 years
About the buyer
National Highways is the government company that plans, designs, builds, operates and maintains England's motorways and major A roads, and buys as a central government body. Suppliers register on the National Highways eSourcing Portal to search live tenders and opportunities. Larger contracts are also advertised on Find a Tender, with Contracts Finder used for smaller opportunities. Most work reaches the market through framework contracts covering major schemes and routine maintenance. The Supply Chain Team handles queries on contracts, frameworks and procurement processes. A social enterprise dynamic purchasing system also opens smaller contracts to voluntary and community organisations.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of National Highways Limited's contract awards have been in construction work, transport equipment and research and development.
Relevant CPV codes
- 73220000 · Development consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov |
31 similar open tenders
See more open tenders related to S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews.
- Open tender
Youth Services Framework
- Open tender
Consultancy and Professional Services
Related buyers
Buyers similar to National Highways Limited.
- 3,061£1.8bn
- 799£8.9bn
- 553£22.8bn
- 477£3.8bn
- 432£24.8m
- 370£408.9m
- 307£337.4m
- 292£10.2bn
- 278£703.9m
- 244£214.9m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
