NRW All Wales Mountain Bike Trail and Maintenance Framework
Details
- Value
- £2,000,000
- Topic
- Paths and other metalled surfaces
- Published
- 23 June 2026
- Source
- uk:find_a_tender
Tender description
NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots. Lot 1 – Mountain Bike Trail Maintenance Works Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to: • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor. • Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk. • Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager. • Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure. • Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities. • Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements. Lot 2 – Mountain Bike Trail Design and Construction Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include: • Detailed trail design. • Securing all necessary permissions, approvals, consents and licences required for project delivery. • Corridor clearance and construction of trails to the specification and grading requirements defined by the Client. • Testing, commissioning and certification that the completed works are fit for purpose. • Formal handover of completed trails and associated documentation to the Client.
Timeline
- Completed: Pre-tender published23 June 2026Current notice
About the buyer
Natural Resources Wales is a non-departmental public body, and buys through its own NRW Procurement team. Smaller purchases are awarded directly with a written quote, rising to tender as value increases. Framework agreements are available through the National Procurement Service, Crown Commercial Service and the Eastern Shires Purchasing Organisation. Contract managers and requestors across the organisation raise and manage their own purchases.
Over the past 5 years, most of Natural Resources Wales's contract awards have been in waste, cleaning and environmental services, agricultural and horticultural services and construction work.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@natural-resources-wales.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@natural-resources-wales.gov |
2 similar open tenders
See more open tenders related to Paths and other metalled surfaces.
Related topics
Topics related to NRW All Wales Mountain Bike Trail and Maintenance Framework, ranked by notice volume.
- 14,363£1.1tn
- 2,141£4.4bn
- 33,002£2.4tn
- 1,030£620.0m
Related buyers
Buyers similar to Natural Resources Wales.
- 139£232.4m
- 130£891.3m
- 37£34.0k
- 34£1.4m
- 26£4.4m
- 10£16.1m
- 4£172.8k
- 2,955£729.2m
- 1,210£14.4bn
- 824£8.9bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.