Refurbishment and Upgarde of Noup Head Lighthouse
Details
- Supplier(s)
- R. S. Merriman Ltd
- Value
- £295,706.5
- Duration
- 10 months
- Topic
- Works for complete or part construction and civil engineering work
- Published
- 4 June 2026
- Source
- uk:find_a_tender
Tender description
The Works The Civil and Electrical Bill of Quantities issued as part of this tender package detail all aspects of the project. The main items of project work are as listed below: - 1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and HSG264, Asbestos: The survey guide. 2.The Principal Contractor is expected to test the existing ‘HCL’ fall arrest system and re-certify it, if necessary, before use. The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes. 3.Establish temporary light. 4.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging. 5.Land plant/materials/camp on site and establish site. 6.Replacement of balcony handrail and metal deck floor in watch room. 7.Upgrade of electrical installation. 8.Upgrade of AtoN and power supply. 9.Full redecoration of the station. 10.Refurbishment of all NLB owned buildings including roof coverings. 11.De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. The contractor must have a responsible person in attendance who has successfully passed a recognised Dangerous Goods training course. This is to confirm the method of packaging for the transportation of any dangerous goods (either by land, air or sea) is correct and in accordance with the relevant standards and that the accompanying paperwork is signed. Loads to be prepared as per NLB guidance for underslinging and clearance by NLV Pharos/helicopter. Take delivery of loads at NLB Oban. 12.The Principal Contractor is to supply the NLB Project Engineer with ‘as-built’ information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations. During the proposed works, it is essential that the Aids to Navigation are not prevented from operating at any stage that they are required. Details will be provided on the basic operation of these items to allow the Contractor to prevent his operatives from affecting the Aids to Navigation. For detailed description of the works refer to the Bill of Quantities. Programme All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 23 June 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works. It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 22 April 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site. ## Contract award Title: Refurbishment and Upgrade of Noup Head Lighthouse
Timeline
- Completed: Award date27 May 2026
- Completed: Award published4 June 2026Current notice
- Next: Contract expiry date31 March 2027in 5 months
About the buyer
Northern Lighthouse Board is the General Lighthouse Authority for Scotland and the Isle of Man, a central government agency with its own procurement team. The board maintains 208 lighthouses and 174 buoys along some of the UK's most exposed coastlines. Aviation services are procured jointly with Trinity House across their combined areas. Larger contracts, including its vessel replacement programme, go out to open, competitive tender under UK procurement legislation.
Over the past 5 years, most of Northern Lighthouse Board's contract awards have been in construction work, transport equipment and transport support and travel services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@northern-lighthouse-board.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@northern-lighthouse-board.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@northern-lighthouse-board.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@northern-lighthouse-board.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@northern-lighthouse-board.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@northern-lighthouse-board.gov |
163 similar open tenders
See more open tenders related to Works for complete or part construction and civil engineering work.
- Open tender
Frimley Lodge Car Park Project
Related topics
Topics related to Refurbishment and Upgarde of Noup Head Lighthouse, ranked by notice volume.
- 8,962£740.2bn
- 55,309£5.5tn
- 7,628£38.1bn
- 19,328£1.1tn
- 4,267£99.7bn
- 47,010£2.0tn
Related buyers
Buyers similar to Northern Lighthouse Board.
- 168£470.6m
- 118£289.6m
- 96£14.9m
- 71£8.5m
- 64£45.3m
- 62£13.3m
- 60£13.7m
- 46£7.9bn
- 43£11.9m
- 39£11.1m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.