Auto-Reconfiguration Signalling Power Supply Systems - Preliminary Market Engagement
Details
- Buyer
- Network Rail
- Topic
- Signalling equipment
- Published
- 23 March 2026
- Submission
- 20 April 2026
- Source
- uk:find_a_tender
Tender description
Network Rail operates a large portfolio of Auto Reconfiguration systems used to support the resilience of 400V TN S and 650V IT signalling power supplies. Many of these systems have been operational for more than two decades and face several challenges: • Obsolescence of essential components affecting maintainability and availability • Reliance on legacy telecoms (such as 3G) due to national network withdrawals • Rising failure risk due to ageing cables, switchgear and protection components • Limited diagnostic capability in existing systems • Inconsistent compatibility with modern power protection and monitoring solutions • Increasing sustainability pressures, including carbon reduction and waste minimisation To support Network Rail’s long-term asset strategy and maintain operational performance, we are exploring a future programme to introduce a modern, cyber secure, modular, maintainable Auto Reconfiguration SPS platform. This aligns to wider organisational objectives including: • Improving safety and reliability for passengers and freight • Supporting digital railway capabilities • Reducing operational carbon • Enhancing maintainability • Delivering sustainable whole life value This preliminary market engagement will help confirm commercial viability, test supplier capability, and identify innovative approaches to support a future-proofed solution. It also seeks to understand the level of interest from the supply chain for any future tendering activity.
Timeline
- Completed: Pre-tender published23 March 2026Current notice
About the buyer
Network Rail runs a safe, efficient railway, and buys as a central public body split between a national Route Services team and its regional routes. Network Rail's latest spend reporting covers Control Period 7, the 2024-25 financial year.
Safety-critical work needs audited status on RISQS, the rail industry's supplier qualification scheme, before Network Rail contracts directly.
Over the past 5 years, most of Network Rail's contract awards have been in IT services, architectural and engineering services and construction work.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@network-rail.gov |
Related topics
Topics related to Auto-Reconfiguration Signalling Power Supply Systems - Preliminary Market Engagement, ranked by notice volume.
- 1,148£166.4bn
Related buyers
Buyers similar to Network Rail.
- 1,808£172.3bn
- 509£240.8m
- 445£6.2bn
- 408£112.0m
- 394£649.4m
- 324£1.2bn
- 259£3.1bn
- 150£1.0bn
- 127£1.6bn
- 124£551.8m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.