Noise Barrier Specialist Bolts and Fixings
Details
- Value
- £3,750,000
- Topic
- Bolts
- Published
- 18 March 2026
- Submission
- 3 April 2026
- Source
- uk:contracts_finder
Tender description
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB are looking for a competent Supplier to deliver the routewide drainage requirements consisting of plastic drainage both solid and perforated of diameters 150mm to 1200mm circa 143,000 meters, concrete pipes of diameters 150mm to 2,100mm circa 4,300m, catchpits including cover slabs of various diameters 600mm to 3000mm in various depths circa 4,000 instances. About the buyer's selection process: Through this expression of interest you vetted in accordance with the EKFB pre-qualification model - for further information visit https://www.competefor.com/EiffageKier/ About the buyer: EKFB is a joint venture that brings together international, market leading expertise from four leading civil engineering and construction companies: Eiffage, Kier, Ferrovial Construction and BAM Nuttall. All four partners bring specialist expertise in the design, construction, operation, financing and maintenance of railway networks, including some of Europe's largest high speed rail projects. EKFB is committed to improving lives, communities and the engineering and construction industry by providing sustained employment opportunities and being a good neighbour, protecting the environment and the places we work. Our inclusive culture ensures that our collaborative and innovative solutions provide exceptional value for money.
Timeline
- Completed: Tender published18 March 2026Current notice
- Completed: Submission date3 April 2026
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
Related topics
Topics related to Noise Barrier Specialist Bolts and Fixings, ranked by notice volume.
- 14,366£1.1tn
- 55,662£5.5tn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,956£753.8m
- 1,203£13.7bn
- 822£8.9bn
- 547£16.2bn
- 505£4.2bn
- 445£130.8m
- 400£385.2m
- 379£1.8m
- 324£340.8m
- 288£10.2bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.