Closed tender

9548 Wicklow Station BEMU Charging Infrastructure System Project

Details

Topic
Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
Published
19 March 2026
Submission
15 May 2026

Tender description

This is a call for competition by Iarnród Éireann – Irish Rail (“IÉ”) seeking suitably qualified candidates to participate in the tender competition for the design and build of the Battery Electric Multiple Unit (BEMU) Charging Infrastructure System Project (the “BEMU Project”). The Project will provide battery train charging infrastructure at Wicklow Station, County Wicklow in Ireland (“BEMU Charging Infrastructure System Project”)(Reference: 9548). The BEMU Charging Infrastructure System Project forms a part of the Wicklow Rail Capacity Enhancement Project (the “WCE Project”) which is a strategic initiative led by IÉ to improve rail connectivity between Dublin City Centre and Wicklow Town. It supports sustainable travel, addresses increasing passenger demand, and aligns with national decarbonisation goals. The project is part of the National Transport Authority’s Greater Dublin Area Transport Strategy 2022–2042, specifically under Measure RAIL3 – DART Extension. The preferred operational model to deliver on the WCE objectives involves deploying BEMUs to provide one train per hour per direction between Dublin and Wicklow. IÉ has already made the first order of BEMU trains which are expected to enter into service during [2026]. For BEMUs to operate successfully, charging facilities are required to recharge the batteries. Following development of new facilities at Drogheda Station, IÉ has identified the Southern Line as the next phase for the expansion of the BEMU deployment, with Wicklow Station as the preferred charging station location. The BEMU trains will utilise the existing overhead line equipment north of Greystones and run-on battery power between Greystones and Wicklow, where they will be charged.

Timeline

  1. Completed: Tender published19 March 2026
    Current notice
  2. Completed: Submission date15 May 2026

About the buyer

Iarnród Eireann-Irish Rail operates Ireland's passenger and freight rail network as a subsidiary of CIÉ, with its own procurement department. Procurement covers the goods, services and works needed to keep the network running safely. A Chief Civil Engineer oversees infrastructure works such as track, bridges and stations. A published Sustainable Procurement Strategy, developed with the Supply Chain Sustainability School, shapes purchasing decisions across the business.

Over the past 5 years, most of Iarnród Eireann-Irish Rail's contract awards have been in architectural and engineering services, transport equipment and construction work.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

98 similar open tenders

See more open tenders related to Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment.

Explore all open tenders

Related topics

Topics related to 9548 Wicklow Station BEMU Charging Infrastructure System Project, ranked by notice volume.

View all topics

Related buyers

Buyers similar to Iarnród Eireann-Irish Rail.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.