EEAST - Framework for Vehicle Windscreen Service (24-T24)
Details
- Value
- £5,000,000
- Topic
- Repair, maintenance and associated services of vehicles and related equipment
- Published
- 25 February 2025
- Submission
- 7 April 2025
- Source
- uk:find_a_tender
Tender description
The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types. Lot 2B: 10. LOT 2B SOUTH WEST AND SOUTH EAST LONDON - LONDON AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 3A: 11. LOT 3A KENT - SOUTH EAST COASTAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 3B: 12. LOT 3B SURREY - SOUTH EAST COASTAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 3C: 13. LOT 3C SUSSEX - SOUTH EAST COASTAL AMBULANCE SERVICE: SOUTH EAST COASTAL AMBULANCE SERVICE: LOT 3C SUSSEX, Lot 4A: 14. LOT 4A SOMERSET - SOUTH WESTERN AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4B: 15. LOT 4B GLOCS - SOUTH WESTERN AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4C: 16. LOT 4C WILTS - SOUTH WESTERN AMBULANCE SERVICE The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4D: 17. LOT 4D DEVON - SOUTH WESTERN AMBULANCE SERVICE; The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4E: 18. LOT 4E DORSET - SOUTH WESTERN AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 4F: 19. LOT 4F CORNWALL AND ISLES OF SCILLY - SOUTH WESTERN AMBULANCE SERVICE; The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 5A: 20. LOT 5A BERKS - SOUTH CENTRAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 5B: 21. LOT 5B BUCKS - SOUTH CENTRAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 5C: 22. LOT 5C OXON - SOUTH CENTRAL AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1A: 3.LOT 1A BEDS - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1B: 4. LOT 1B CAMBS - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1C: 5. LOT 1C HERTS - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1D: 6. LOT 1D ESSEX - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1E: 7. LOT 1E NORFOLK - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 1F: 8. LOT 1F SUFFOLK - EAST OF ENGLAND AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust. Lot 2A: 9. LOT 2A NORTH WEST. NORTH AND NORTH EAST LONDON - LONDON AMBULANCE SERVICE: The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.<br/><br/> The bidder can bid for any number of Lots, with a maximum of 3 sub lots per Ambulance Trust.
Timeline
- Completed: Tender published25 February 2025Current notice
- Completed: Submission date7 April 2025
About the buyer
East of England Ambulance Service NHS Trust provides emergency care across six counties, and buys through the East of England Procurement Hub, a shared service with neighbouring NHS bodies. Much of this procurement flows through framework agreements and the Crown Commercial Service. The National Ambulance Procurement Group coordinates buying across ambulance trusts nationally. Over 2,000 suppliers support its building, fleet and medical equipment needs.
Over the past 5 years, most of East of England Ambulance Service NHS Trust's contract awards have been in construction work, repair and maintenance and business services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@east-of-england-ambulance-service-nhs-trust.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@east-of-england-ambulance-service-nhs-trust.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@east-of-england-ambulance-service-nhs-trust.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@east-of-england-ambulance-service-nhs-trust.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@east-of-england-ambulance-service-nhs-trust.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@east-of-england-ambulance-service-nhs-trust.gov |
7 similar open tenders
See more open tenders related to Repair, maintenance and associated services of vehicles and related equipment.
- Open tender
Vehicle Mechanic Services
Related topics
Topics related to EEAST - Framework for Vehicle Windscreen Service (24-T24), ranked by notice volume.
- 5,988£789.9bn
Related buyers
Buyers similar to East of England Ambulance Service NHS Trust.
- 568£249.5m
- 433£9.7bn
- 353£276.3m
- 266£314.8m
- 243£26.1bn
- 239£217.5m
- 235£14.1bn
- 233£756.5m
- 231£85.2m
- 228£58.8m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.