Awarded contract

ABANDONED - Green Assets Maintenance & Management Procurement

Details

Value
209,408,000
Topic
Landscaping work
Published
22 December 2025

Tender description

As part of the High Speed Rail (London – West Midlands) Act 2017 (HS2 Act), HS2 Ltd has a legal requirement to mitigate its environmental effects. In addition, HS2 Ltd has a requirement through agreements with the Department for Transport to provide environmental benefits. These requirements and provision of benefits include the provision of green assets. HS2 Ltd has acquired much of its land temporarily to construct the railway. Some of this land has been or will be developed into environmental mitigation sites (Green Assets), which range from sites compensating for the loss of grassland, scrub and woodland habitats to new receptor sites for ancient woodland soils, amphibians and reptiles as well as other ecological and landscape mitigation sites. Collectively, this is referred to as our Green Corridor, which, once delivered, will span 3,500ha. Previously HS2 Ltd was intending to appoint Contractor(s) to undertake the Maintenance and Management of green assets which included, but was not limited to the following: • Woodlands; • Grasslands; • Hedgerows; • Ponds, ditches and other non-engineering related drainage features; and • Habitat, including bat houses, reptile banks and hibernacula. HS2 is currently undergoing a programme review to reset the HS2 project (the “Reset”). A decision has been made to abandon the Green Assets Maintenance & Management (GAM&M) procurement due to the revised timings of the programme. Lot Lot 1: Abandoned - Maintenance and Management of Phase 1 Area North The procurement was for a Contractor to provide the services described in the procurement documents under an amended NEC3 Term Service Contract. The contract Award would have been for an initial period of 5 years with the option to extend, at HS2 Ltd's sole discretion, for up to a further 5 years via single or multiple fixed term increments. Lot Lot 2: Abandoned - Maintenance and Management of Phase 1 Area Central / South The procurement was for a Contractor to provide the services described in the procurement documents under an amended NEC3 Term Service Contract. The contract Award would have been for an initial period of 5 years with the option to extend, at HS2 Ltd's sole discretion, for up to a further 5 years via single or multiple fixed term increments. Lot Lot 3: Abandoned - Maintenance and Management of Phase 1 land within the security fence and any operationally sensitive slopes or cuttings. The procurement was for a Contractor to provide the services described in the procurement documents under an amended NEC3 Term Service Contract. The contract Award would have been for an initial period of 5 years with the option to extend, at HS2 Ltd's sole discretion, for up to a further 5 years via single or multiple fixed term increments.

Timeline

  1. Completed: Award published22 December 2025
    Current notice
  2. Completed: Award date22 December 2025

About the buyer

HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.

Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.

AI insights

  • Is the winner their go-to supplier?
  • Will this contract be renewed?
  • What were the buyer's pain points?
  • Why did they win?

Free, no account needed

Get to the next one first

This contract's been awarded. We'll find a buyer that plans to buy what you sell, before any tender is published.

Find my next tender early
Save in app

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

163 similar open tenders

See more open tenders related to Landscaping work.

Explore all open tenders

Related topics

Topics related to ABANDONED - Green Assets Maintenance & Management Procurement, ranked by notice volume.

View all topics
TopicCountValue
  1. 42,054
    £438.6bn

Related buyers

Buyers similar to High Speed Two (HS2) Ltd.

View all buyers
BuyersCountValue
  1. 2,961
    £755.8m
  2. 1,205
    £13.7bn
  3. 824
    £8.9bn
  4. 547
    £16.2bn
  5. 509
    £4.2bn
  6. 445
    £130.9m
  7. 403
    £385.8m
  8. 388
    £1.8m
  9. 324
    £341.6m
  10. 289
    £10.2bn

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.