CO2 Condenser - Preliminary Market Engagement
Details
- Topic
- Engineering design services
- Published
- 9 October 2025
- Submission
- 6 November 2025
- Source
- uk:find_a_tender
Tender description
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement notice is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the design and development of a CO2 condenser that is part of the STEP power cycle. This is because a high-performance CO2 condenser is critical to the efficiency of the STEP powerplant (supercritical and/or transcritical CO2 power generation cycles are currently the preferred concept for the STEP prototypic plant). The proposed technical and operating conditions of the proposed CO2 condenser are: •Operating pressure is between ca. 60-100 bar for the CO2 stream •Operating inlet temperature will be between ca. 50 - 110°C. The outlet temperature will be between ca. 20-25 °C for the CO2 stream. •Thermal duty is in the range of 1-2 GWth. •The equipment must comply with UK pressure equipment regulations. Note: both wet and dry cooling options are of interest, as are both existing and novel technologies or design approaches. For more information about this opportunity, please visit the Delta eSourcing portal at: https://ukifs.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-design-services./2HE569TDE9 To respond to this opportunity, please click here: https://ukifs.delta-esourcing.com/respond/2HE569TDE9
Timeline
- Completed: Pre-tender published9 October 2025Current notice
About the buyer
UK Industrial Fusion Solutions Ltd is a wholly owned subsidiary of the UK Atomic Energy Authority. The company was formed in November 2024 to deliver STEP Fusion. STEP is a prototype fusion power plant planned for West Burton in Nottinghamshire. Major delivery runs through an Integrated Delivery Team of industrial partners. ILIOS, a joint venture of Kier and Nuvia, is the construction partner. Tokamak Energy is the first system partner, for magnets.
Over the past 5 years, most of UK Industrial Fusion Solutions Ltd's contract awards have been in architectural and engineering services, software and information systems and research and development.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@uk-industrial-fusion-solutions-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@uk-industrial-fusion-solutions-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@uk-industrial-fusion-solutions-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@uk-industrial-fusion-solutions-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@uk-industrial-fusion-solutions-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@uk-industrial-fusion-solutions-ltd.gov |
36 similar open tenders
See more open tenders related to Engineering design services.
- Open tender
Cork City Council Housing Programme 2026-28
- Open tender
Lisnamult Access Road N63
- Open tender
Ardsallagh More Access Road
- Open tender
National Developer Framework
Related topics
Topics related to CO2 Condenser - Preliminary Market Engagement, ranked by notice volume.
- 4,997£324.7bn
Related buyers
Buyers similar to UK Industrial Fusion Solutions Ltd.
- 2,963£722.7m
- 1,808£172.3bn
- 1,656£55.7bn
- 1,595£17.0bn
- 1,443£1.6bn
- 1,208£14.4bn
- 1,032£1.8bn
- 1,008£3.3bn
- 897£2.4bn
- 854£129.1bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.