Stale Pre-tender

Design and Supply of Fibre Reinforced Polymer (FRP) Bridges and Decking Systems

Details

Topic
Construction work for bridges
Published
30 September 2025
Submission
15 October 2025

Tender description

Design and supply of Fibre Reinforced Polymer (FRP) Bridges - Roadbridges suitable for 44Tonnes Highways Loading plus supply and design of footbridges, cycleways, bridleways and bridge decking solutions suitable for highways loading (up to 44 Tonnes). The manufacturing process should use the resin infusion technique with a mould. This allows arrangement of fibres at different orientations to ensure maximum performance and if required fibre and resin types can be altered to suit a particular application. Foam core should also be used between the top mat and bottom mat for structural efficiency. Ideally constructed using a proven monolithic FRP system (e.g. InfraCore or equivalent) with vacuum infusion method. This type of construction has a low maintenance requirement and subsequently features a long design life. Elements of the bridge structures will have an expected design life of: - Deck - 100+ years - Surfacing 10+ years - Parapets 30+ years - UV protection 60+ years Also be able to design such bridges and provide outline proposals and detailed costings. Most structures we require will need bespoke designs. Typical projects expected to range between £50k–£250k per bridge, depending on size and specification Be able to manufacture and supply a bridge within a short timeframe up to 3 months.

Timeline

  1. Pre-tenderThis notice (current page)
    Published
    30 Sep 2025

About the buyer

The Forestry Commission is a non-ministerial department for forestry policy, with procurement run through its agencies, Forestry England and Forest Research, coordinated by a Bristol-based commercial team. District offices handle smaller purchases locally through direct quotations. Frameworks, including the Crown Commercial Service, supply many everyday goods and services. Dynamic purchasing systems cover recurring work such as tree planting, civil engineering, fencing and wildlife management.

Over the past 5 years, most of the Forestry Commission's contract awards have been in agricultural and horticultural services, construction work and business services.

AI insights

  • What did Forestry Commission buy in the end?
  • Who does Forestry Commission use for this today?
  • Will Forestry Commission keep buying this?
  • Who are the decision makers?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

6 similar open tenders

See more open tenders related to Construction work for bridges.

Explore all open tenders

Related topics

Topics related to Design and Supply of Fibre Reinforced Polymer (FRP) Bridges and Decking Systems, ranked by notice volume.

View all topics
TopicCountValue
  1. 3,398
    £229.5bn

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.