Locomotive ETCS Fitment Framework
Details
- Buyer
- Network Rail
- Published
- 13 September 2025
- Submission
- 30 September 2025
- Source
- uk:bravosolution
Tender description
Network Rail is introducing digital signalling, which will see traditional lineside signals removed and replaced with European Train Control Systems (ETCS) technology. The implementation will enable continuous, real-time information to the train driver’s cab. ETCS is an in-cab signalling system that enables trains to run closer together, safely and to travel at their optimal speeds. To implement ETCS, it requires changes to signalling infrastructure and fitment of in-cab technology on locomotives. NR is intending to procure a framework to enable the design, supply, installation (fitment), test and put back into service of ETCS equipment fitted across a range of existing locomotive classes, including electric, diesel and steam across the Charter & Heritage and Freight sectors. Network Rail has developed a proposed procurement approach which it now wishes to test with the supply chain to ensure it is both successful in procurement and in operation and therefore we seek the supply chains support in testing this proposed approach that we shall details in our Market Engagement launch and questionnaires thereafter.
Timeline
- Completed: Tender published13 September 2025Current notice
- Completed: Submission date30 September 2025
About the buyer
Network Rail runs a safe, efficient railway, and buys as a central public body split between a national Route Services team and its regional routes. Suppliers must register on BravoNR, Network Rail's procurement portal, before bidding for work. Every prospective supplier also registers on Find a Tender, the Cabinet Office's digital platform. Safety-critical work needs audited status on RISQS, the rail industry's supplier qualification scheme, before Network Rail contracts directly. A contract register lists every national contract and framework, with a contact for each. Network Rail's latest spend reporting covers Control Period 7, the 2024-25 financial year.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of Network Rail's contract awards have been in IT services, architectural and engineering services and construction work.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@network-rail.gov |
Related buyers
Buyers similar to Network Rail.
- 1,865£208.9bn
- 509£245.0m
- 429£15.3bn
- 426£117.3m
- 380£641.6m
- 298£3.1bn
- 269£1.2bn
- 153£987.8m
- 129£1.7bn
- 125£559.8m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.