BBV Sublot 1B Tunnel Grout Treatment
Details
- Value
- £1,750,000
- Topic
- Grout
- Published
- 8 September 2025
- Submission
- 15 September 2025
- Source
- uk:contracts_finder
Tender description
"Ground Treatment " The SC (Subcontractor) will assess the findings of the probe hole investigation and will develop the grout treatment strategy to be followed with a scope to minimize any excess water ingress during CP excavation and improve the ground stability. Grouting operations will include stage permeation grouting on max 1m steps, with the use of packers. Subcontractor based on ground and ground-water conditions as revealed from ground investigation (probe holes) shall develop the grouting strategy. The strategy will include as a minimum but not exclusively the following: • A grouting pattern of primary and secondary on the periphery of CP profile • Drilling diameter, orientation, and lengths of each grouting hole • Bottom-up grouting stages with the use of packers. The grouting stages should not exceed the length of 1m. • In case required (unstable ground) Subcontractor may need to make use of a tube a manchette TAM (sleeve pipes) system to perform the grouting. In this case the strategy should be developed accordingly. • Mix design(s) of the grout injection • Max Pressure and max Volume criteria for stopping each grouting stage • Tertiary drilling holes in case primary and secondary do not reach the target criteria. • As built records grouting locations lengths stages grout consumptions and max pressure. " Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Timeline
- Completed: Tender published8 September 2025Current notice
- Completed: Submission date15 September 2025
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Contracts above the public procurement threshold are advertised on Find a Tender, and smaller awards appear on Contracts Finder. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain. Live subcontract opportunities are advertised through the CompeteFor portal.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Relevant CPV codes
- 44831400 · Grout
- 45262340 · Grouting work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
1 similar open tenders
See more open tenders related to BBV Sublot 1B Tunnel Grout Treatment.
Related topics
Topics related to BBV Sublot 1B Tunnel Grout Treatment, ranked by notice volume.
- 1,748£49.3bn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 3,054£1.8bn
- 1,200£14.2bn
- 802£8.9bn
- 551£22.8bn
- 485£3.8bn
- 426£24.7m
- 374£413.7m
- 300£335.8m
- 293£10.2bn
- 272£693.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.