Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure
Details
- Value
- £1,750,000
- Topic
- Structural steelworks
- Published
- 20 August 2025
- Submission
- 26 August 2025
- Source
- uk:contracts_finder
Tender description
Mace Dragados require a steelwork subcontractor to carry out the design (to Stage 5) supply, fabrication, installation and erection of the following 1. A 13200mm long 2100mm wide link bridge connecting the Maria Fidelis Old School Building and the Maria Fidelis Building Accommodation first floors. Includes steel structure, concrete foundations and cladding. 2. Steel frame structure, concrete foundations and external cladding for a 8 person lift shaft on the Maria Old School Building providing access to ground level, bridge level, first floor, second floor and roof. Lift to be installed by Others. 3. A 10m x 4m steel canopy at the entrance of the Maria Fidelis Old School Building. See attached drawings
Timeline
- Completed: Tender published20 August 2025Current notice
- Completed: Submission date26 August 2025
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Contracts above the public procurement threshold are advertised on Find a Tender, and smaller awards appear on Contracts Finder. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain. Live subcontract opportunities are advertised through the CompeteFor portal.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Relevant CPV codes
- 45223210 · Structural steelworks
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
6 similar open tenders
See more open tenders related to Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure.
- Open tender
Construction work
- Open tender
Construction materials and associated items
- Open tender
Building Trades Contractor DPS
Related topics
Topics related to Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure, ranked by notice volume.
- 22,326£2.3tn
- 3,828£380.8bn
- 54,808£5.5tn
- 9,118£634.3bn
- 365£4.2bn
- 9,053£765.7bn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 3,054£1.8bn
- 1,200£14.2bn
- 802£8.9bn
- 551£22.8bn
- 485£3.8bn
- 426£24.7m
- 374£413.7m
- 300£335.8m
- 293£10.2bn
- 272£693.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
