Closed tender

Lot C: River Colne Constructed Wetland Outline Design and Feasibility

Details

Value
£25,000
Topic
River regulation and flood control works
Published
18 August 2025
Submission
12 September 2025

Tender description

This tender will encompass the following activities. 1. Topographical, hydrological, sediment and water quality surveys to understand the through-flow regime, likely input quality and quantities for a range of surface water run-off conditions. 2. Strategic investigation of on-site ground contamination and suitability of existing sediments for re-use or to allow identification of requirements for disposal (including Water Regulations (WR), Waste Management (WM3), and Waste Acceptance Criteria (WAC) as needed). 3. Biodiversity Net Gain assessment and Preliminary Ecological Appraisal highlighting lessons learned from the historic wetland design where evidence exists. 4. A multi-criteria options appraisal matrix to record and assess relative costs and benefits of a variety of sub-options and approaches to determine an evidenced preferred option. 5. Lead a stakeholder workshop and consultation exercise. 6. Provide appropriate information design to support discussions with stakeholders including reference to options for sediment movement volumes, space for sediment drying / processing area, gravel quantities / sourcing, water volume and retention requirements for functional filtration and water quality improvements, options for widening boundary onto playing fields if needed, etc re design and permitting constraints. 7. Develop the preferred option into a more formalised and feasible outline design that can be used in wider consultation and in early permitting discussions to enable an iterative design process and clearly specifies the required detail going forwards. 8. Identify the requirements for gaining consents. 9. Create / initialise necessary documentary evidence and applications for consents to build, using approved outline designs. 10. Attend regular meetings with the project manager and external stakeholders (as agreed) to inform design process. See detail in section 4. 11. Include detail of the likely management and maintenance requirements post construction to ensure sustainability and longevity of the constructed wetland. To include description, scale and optimal frequency of necessary ongoing maintenance activities where relevant. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Watford:-River-regulation-and-flood-control-works./BQW35F353G To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/BQW35F353G

Timeline

  1. TenderThis notice (current page)
    Published
    18 Aug 2025
    Deadline
    12 Sep 2025

About the buyer

Lot C: River Colne Constructed Wetland Outline Design and Feasibility is a public sector buyer in the United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

AI insights

  • Who did the buyer use last time?
  • Will the buyer buy this again?
  • What was the buyer trying to fix?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

20 similar open tenders

See more open tenders related to River regulation and flood control works.

Explore all open tenders

Related topics

Topics related to Lot C: River Colne Constructed Wetland Outline Design and Feasibility, ranked by notice volume.

View all topics

Related buyers

Buyers similar to Lot C: River Colne Constructed Wetland Outline Design and Feasibility.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.