BBV HS2 MWCC North - Soil surveys
Details
- Value
- £750,000
- Topic
- Soil
- Published
- 14 August 2025
- Submission
- 1 September 2025
- Source
- uk:contracts_finder
Tender description
BBV is seeking a Subcontractor to carry out post reinstatement soil surveys and aftercare management plans on Sectors N1 and N2 of the IPT Area North for Schedule 16 land parcels, which are agricultural land parcels that have been temporarily acquired for the construction of the HS2 railway. Following construction, the Schedule 16 land parcels will be reinstated to a similar condition as the baseline, followed by soil surveys to ascertain that the pre-construction target was achieved during reinstatement. This forms part of the hand over process for agricultural landowners. The post reinstatement soil surveys are to be carried out by a soil specialist who has experience of carrying out field surveys of soils to record physical properties using the Soil Survey Field Handbook. The surveyor should meet the British Society of Soil Science ALC Competency Standards. The report should also include an aftercare management plan which identifies issues that need to be rectified during the 5-year aftercare period, to ensure that the original ALC can be reinstated at the end of the aftercare period. The Subcontractor for this package may also be responsible for carrying out non-intrusive, visual drainage surveys to identify existing outfalls, header drains and lateral drains and proposing any required remediation measures for drains and the surrounding soils.
Timeline
- Completed: Tender published14 August 2025Current notice
- Completed: Submission date1 September 2025
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Contracts above the public procurement threshold are advertised on Find a Tender, and smaller awards appear on Contracts Finder. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain. Live subcontract opportunities are advertised through the CompeteFor portal.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Relevant CPV codes
- 14212400 · Soil
- 90522000 · Services relating to contaminated soil
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
4 similar open tenders
See more open tenders related to BBV HS2 MWCC North - Soil surveys.
- Open tender
PfH Materials Supply Framework
- Open tender
PfH Materials Supply Framework
- Open tender
Professional Consultancy Services DPS
- Open tender
Building construction work
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 3,054£1.8bn
- 1,200£14.2bn
- 802£8.9bn
- 551£22.8bn
- 485£3.8bn
- 426£24.7m
- 374£413.7m
- 300£335.8m
- 293£10.2bn
- 272£693.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
