Ballylanders Garda Station
Details
- Value
- €600,000
- Topic
- Building construction work
- Published
- 28 February 2024
- Submission
- 29 March 2024
- Source
- ie:e_tenders
Tender description
Thermal Upgrade and Alterations to the existing Ballylanders Garda Station. The project includes for carrying out works to the existing Garda Station Site and Temporary Works to ensure the surrounding Garda Station and Married Quarters facilities remain uninterrupted throughout the course of the works. Contractor to make good any damage to existing structures and finishing's within the building where affected by the works. Provide for necessary temporary hoarding during the course of the works and remove on completion. All costs in connection with this condition shall be included in the rates including supervision, co-ordination, attendances, health and safety, and insurances. - Installation of external insulation and proprietary external render system to specified external walls. - Lifting of suspended timber floor at ground level, installation of insulation below floor and laying of new floor. - Insulation of roof, in attic space. - Removal and replacement of external windows and doors. - Removal of asbestos containing materials. - Installation of new powder coated aluminium windows and doors. - Lifting of existing suspended timber floor, insulation of floor and installation of new subfloor. - Removal of all attached signage and mechanical/electrical fixtures and fittings and refitting of all fixtures and fitting back to existing external wall though new insulation. - Site works involving relocation of gullies and drains to accommodate additional depth of insulation to external walls. - Re-decoration all internal finishes. - Mechanical Installation and associated Builder's Works. - Electrical Installation and associated Builder's Works. Thermal Upgrade and Alterations to the existing Ballylanders Garda Station. The project includes for carrying out works to the existing Garda Station Site and Temporary Works to ensure the surrounding Garda Station and Married Quarters facilities remain uninterrupted throughout the course of the works. Contractor to make good any damage to existing structures and finishing's within the building where affected by the works. Provide for necessary temporary hoarding during the course of the works and remove on completion. All costs in connection with this condition shall be included in the rates including supervision, co-ordination, attendances, health and safety, and insurances. - Installation of external insulation and proprietary external render system to specified external walls. - Lifting of suspended timber floor at ground level, installation of insulation below floor and laying of new floor. - Insulation of roof, in attic space. - Removal and replacement of external windows and doors. - Removal of asbestos containing materials. - Installation of new powder coated aluminium windows and doors. - Lifting of existing suspended timber floor, insulation of floor and installation of new subfloor. - Removal of all attached signage and mechanical/electrical fixtures and fittings and refitting of all fixtures and fitting back to existing external wall though new insulation. - Site works involving relocation of gullies and drains to accommodate additional depth of insulation to external walls. - Re-decoration all internal finishes. - Mechanical Installation and associated Builder's Works. - Electrical Installation and associated Builder's Works.
Timeline
- Completed: Tender published28 February 2024Current notice
- Completed: Submission date29 March 2024
About the buyer
The Office of Public Works (OPW) manages Ireland's state property, heritage sites and flood defences as a government office with its own procurement function. Tenders are advertised on eTenders, the national procurement platform run by the Office of Government Procurement. Framework contracts cover recurring work, including a current multiparty framework for fit-out and refurbishment design and construction. Works, supplies and services, including consultancies, make up its day-to-day procurement activity. Tenders often form part of a larger capital project, such as acquiring or fitting out a building. Public procurement guidelines, regulations and directives govern how OPW buys.
€29.5bn was the estimated value of contracts awarded across the Irish public sector in 2025.
Over the past 5 years, most of OPW's contract awards have been in architectural and engineering services, construction work and business services.
Relevant CPV codes
- 45210000 · Building construction work
- 45216111 · Police station construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@office-of-public-works-opw.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@office-of-public-works-opw.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@office-of-public-works-opw.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@office-of-public-works-opw.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@office-of-public-works-opw.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@office-of-public-works-opw.gov |
117 similar open tenders
See more open tenders related to Ballylanders Garda Station.
- Open tender
The Core Refurbishment
Related topics
Topics related to Ballylanders Garda Station, ranked by notice volume.
- 54,874£5.5tn
- 24,709£1.7tn
- 6,368£459.5bn
- 21,066£665.5bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.