CHP LTHW Heat Recovery Principal Contractor
Details
- Value
- £300,150
- Topic
- Electricity, heating, solar and nuclear energy
- Published
- 2 December 2024
- Submission
- 13 January 2025
- Source
- uk:contracts_finder
Tender description
The Pirbright Institute is inviting tenders for the CHP LTHW Heat recovery project - Principal Contractor & Installation Work Package. The contract is for a single supplier to provide the Principal Contractor role and deliver Mechanical & Electrical Installation, commissioning of the CHP LTHW Heat Recovery project. As part of this tender scope a RIBA3 Design for Tender M&E package has been provided to enable vendors to price this work package. The contract is for a single supplier to be the Principal Contractor and to deliver Mechanical & Electrical installation works for the integration of a heat recovery system from the sites existing CHP to the Plowright Building at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. The scope of works will involve: • Preparation for a construction ready design as outlined in Section 4.4. Appendix E - CHP LTHW Heat Recovery Principal Contractor Specification V1.1. • Supply, manufacture, delivery and installation of Mechanical & Electrical works as outlined in the provided design pack within this ITT. • Planning of works and required shutdowns to implement enabling works • Working with nominated controls contractor to ensure implementation of control packages are planned accordingly into construction phase program • Final commissioning on completion of system installation. • On completion of commissioning, remove and dispose of any redundant plant & equipment • Management of all subcontractors employed by the supplier to complete these works. • Training and Operational Procedures • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning. A separate section should be provided to show details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome. A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS For this tender, the supplier is required to provide a cost for annual servicing of the newly installed heat recovery plant. The requirements for this service contract are: • Spares List showing the itemised costs.
Timeline
- Completed: Tender published2 December 2024Current notice
- Completed: Submission date13 January 2025
About the buyer
The Pirbright Institute is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 09300000 · Electricity, heating, solar and nuclear energy
- 45259900 · Plant upgrade work
- 71314310 · Heating engineering services for buildings
- 71321000 · Engineering design services for mechanical and electrical installations for buildings
- 71333000 · Mechanical engineering services
- 71334000 · Mechanical and electrical engineering services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-pirbright-institute.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-pirbright-institute.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-pirbright-institute.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-pirbright-institute.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-pirbright-institute.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-pirbright-institute.gov |
72 similar open tenders
See more open tenders related to CHP LTHW Heat Recovery Principal Contractor.
- Open tender
Corporate Power Purchase Agreements
- Open tender
Mechanical & Electrical Framework
- Open tender
Mechanical & Electrical Framework
Related topics
Topics related to CHP LTHW Heat Recovery Principal Contractor, ranked by notice volume.
- 54,808£5.5tn
- 24,660£1.7tn
- 16,963£827.4bn
- 11,640£582.3bn
- 4,784£265.6bn
- 6,361£459.0bn
Related buyers
Buyers similar to The Pirbright Institute.
- 3,054£1.8bn
- 1,872£208.5bn
- 1,708£67.8bn
- 1,591£17.1bn
- 1,367£1.6bn
- 1,200£14.2bn
- 1,049£3.2bn
- 993£1.8bn
- 884£2.5bn
- 868£126.6bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.