Tate - Tate Modern Blavatnik L2 South Gallery re-design - Creating a flexible and sustainable exhibition space - Request for Information
Details
- Buyer
- Tate Gallery
- Value
- £200,000
- Topic
- Architectural, construction, engineering and inspection services
- Published
- 30 October 2024
- Submission
- 15 November 2024
- Source
- uk:contracts_finder
Tender description
Last financial year, over £400k was spent on alternations of the Tate Modern gallery spaces, mainly dismantling and re-building walls to suit the layout requirements for each exhibition. This practise also contributes to one of the largest portions of the carbon footprint generated by exhibitions production. The next three exhibitions scheduled for Blavatnik L2 South Gallery are The Genesis Exhibition: Do Ho Suh, Light&Magic and Ana Mendieta. Each of these will require very different typology of artworks and different wall configurations, entailing significant structural changes that will further compound negative cost and carbon footprint trends. It is highly likely that, following current practice, a number of walls built for Light&Magic, will be demolished for the following show. The Genesis Exhibition: Do Ho Suh, scheduled prior to this, also provides a unique window of opportunity where we will be required to completely dismantle all walls in the gallery space, thus creating a blank canvas to work from. OUR AIMS - WHAT WE WANT TO ACHIEVE The TM Programme team would like to turn this challenge into an opportunity, where we are taking advantage of a completely empty space to design a new gallery that could be adapted for multiple exhibition projects. This project will commission specialised designers to design a set of modular, movable and re-configurable walls to use in Blavatnik L2 South Gallery. This would allow us to respond to project-specific spatial needs by achieving multiple layouts with flexible setworks, making substantial efficiencies in construction costs, materials, labour and waste. Blavatnik L2 South Gallery will enable us to pilot new ways of working in exhibition productions, providing a template that could be applied to other spaces at Tate Modern and other sites. This will also highlight Tate as a leader in developing new approaches to sustainable and circular exhibition production approaches for the wider art sector.
Timeline
- Completed: Tender published30 October 2024Current notice
- Completed: Submission date15 November 2024
About the buyer
Tate Gallery is a public sector buyer in the United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@tate-gallery.gov |
139 similar open tenders
See more open tenders related to Architectural, construction, engineering and inspection services.
- Open tender
DPS1 1436 - Housing Tree Works
- Open tender
DPS1 1436 - Housing Tree Works
- Open tender
DPS1 1448 - The Grove Tree Work
- Open tender
DPS1 1430 - Fell Highway Trees
Related buyers
Buyers similar to Tate Gallery.
- 2,969£726.3m
- 1,211£14.4bn
- 822£8.9bn
- 544£16.2bn
- 512£4.2bn
- 446£130.9m
- 398£428.5m
- 356£1.7m
- 321£340.3m
- 286£10.2bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.