Closed tender

Supply and install a footbridge across the River Wye close to Millers Dale - Chee Dale Footbridge

Details

Value
£20,000
Topic
Footbridge construction work
Published
2 September 2024
Submission
24 September 2024

Tender description

Cheedale footbridge is a timber beam bridge spanning the River Wye, the bridge sits below the Cheedale Viaduct just off the Monsal trail. Access to the bridge is via the Monsal trail down the steep embankment (footpath) towards the River Wye. The Timber footbridge spans the river sitting on a stone built abutment either side which is in need of some repair works. The bridge is currently shut off for use as it is deemed unsafe. The Authority wishes to replace the existing timber footbridge, Cheedale Bridge, just off the Monsal trail. Proposed Bridge works to include: • Removal of the existing footbridge • Replace damaged, defected and missing stonework to the abutments, steps and plinths. • Rake out defective and missing mortar joints to the abutments, steps and plinths and repoint. • Install a new footbridge similar to existing with an anti-slip deck and fully compliant with current legislation. Note: The contractor is to complete all load calculations as recommended by the British Standards to ensure the existing plinth can take the new load of the bridge. • Install new handrail and fencing where necessary to ensure the footbridge, steps and surrounding embankment on the approach to the bridge is compliant exceeding the minimum standards set by the British Standard Institute. A full tender pack including details of the scope and location of the works alongside a specification of works can be obtained once an expression of interest is received by emailing catherine.johnson@peakdistrict.gov.uk and requesting the tender pack reference 'Chee Dale Foot Bridge'.

Timeline

  1. Completed: Tender published2 September 2024
    Current notice
  2. Completed: Submission date24 September 2024

About the buyer

The Peak District National Park Authority is a local public body based in Bakewell, Derbyshire. The Procurement Act 2023 has applied to its tendering since 24 February 2025. Details of every invitation to tender above its publication threshold are published.

Over the past 5 years, most of the Peak District National Park Authority's contract awards have been in construction work, agricultural and horticultural services and transport services.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

2 similar open tenders

See more open tenders related to Footbridge construction work.

Explore all open tenders

Related topics

Topics related to Supply and install a footbridge across the River Wye close to Millers Dale - Chee Dale Footbridge, ranked by notice volume.

View all topics

Related buyers

Buyers similar to Peak District National Park Authority.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.