Supply and install a footbridge across the River Wye close to Millers Dale - Chee Dale Footbridge
Details
- Value
- £20,000
- Topic
- Footbridge construction work
- Published
- 2 September 2024
- Submission
- 24 September 2024
- Source
- uk:contracts_finder
Tender description
Cheedale footbridge is a timber beam bridge spanning the River Wye, the bridge sits below the Cheedale Viaduct just off the Monsal trail. Access to the bridge is via the Monsal trail down the steep embankment (footpath) towards the River Wye. The Timber footbridge spans the river sitting on a stone built abutment either side which is in need of some repair works. The bridge is currently shut off for use as it is deemed unsafe. The Authority wishes to replace the existing timber footbridge, Cheedale Bridge, just off the Monsal trail. Proposed Bridge works to include: • Removal of the existing footbridge • Replace damaged, defected and missing stonework to the abutments, steps and plinths. • Rake out defective and missing mortar joints to the abutments, steps and plinths and repoint. • Install a new footbridge similar to existing with an anti-slip deck and fully compliant with current legislation. Note: The contractor is to complete all load calculations as recommended by the British Standards to ensure the existing plinth can take the new load of the bridge. • Install new handrail and fencing where necessary to ensure the footbridge, steps and surrounding embankment on the approach to the bridge is compliant exceeding the minimum standards set by the British Standard Institute. A full tender pack including details of the scope and location of the works alongside a specification of works can be obtained once an expression of interest is received by emailing catherine.johnson@peakdistrict.gov.uk and requesting the tender pack reference 'Chee Dale Foot Bridge'.
Timeline
- Completed: Tender published2 September 2024Current notice
- Completed: Submission date24 September 2024
About the buyer
The Peak District National Park Authority is a local public body based in Bakewell, Derbyshire. The Procurement Act 2023 has applied to its tendering since 24 February 2025. Details of every invitation to tender above its publication threshold are published.
Over the past 5 years, most of the Peak District National Park Authority's contract awards have been in construction work, agricultural and horticultural services and transport services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@peak-district-national-park-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@peak-district-national-park-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@peak-district-national-park-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@peak-district-national-park-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@peak-district-national-park-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@peak-district-national-park-authority.gov |
2 similar open tenders
See more open tenders related to Footbridge construction work.
Related topics
Topics related to Supply and install a footbridge across the River Wye close to Millers Dale - Chee Dale Footbridge, ranked by notice volume.
- 3,479£229.5bn
- 11,541£1.0tn
- 27,835£1.7tn
- 4,975£286.3bn
Related buyers
Buyers similar to Peak District National Park Authority.
- 402£12.7bn
- 137£1.0bn
- 111£6.7m
- 108£499.2m
- 84£1.2bn
- 80£398.7m
- 61£16.7m
- 50£108.4m
- 48£32.2m
- 28£3.8m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.