BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor
Details
- Supplier(s)
- JT Mackley & Co Ltd
- Value
- £12,500,000
- Duration
- 2 years
- Topic
- Construction work
- Published
- 2 September 2024
- Source
- uk:contracts_finder
Tender description
Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark. At 865m long in total it is one of the longest cast-iron structures in the world and an admired piece of Victorian architecture, integral to the Eastern Seafront. It is also a significant Grade 2* listed structure within the rich heritage context of the wider coastal city. Phase 1 of the Madeira Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent steps and the Shelter Hall / Concord 2. The cast iron structure forms a backbone describing the historic development of the seafront. Addressing the sea and the beach firmly braced against the rising East Cliff wall rising behind. It is a 'backdrop': designed and intended to be used and inhabited by the residents of the city for all manner of events and social occasions; for quiet enjoyment, outdoor exercise and for viewing. The structure is now deemed unsafe and public access has not been possible for a number of years, due its condition. The Phase 1 project includes the following elements of works: • Conservation and repair of the historic cast iron structure. • Conservation and management of the historic Japanese Spindle green wall [dating from 1872], and other planting associated with the Green Wall. • Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure. • Public realm landscaping to both the terrace deck above and the promenade walkway below, including new hard surfacing, soft landscaping and street furniture. • Local improvement to Madeira Drive, via new pedestrian crossing points. • New lighting and servicing infrastructure • Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2 building, to allow its continued historic function as the original means of step-free access to the terrace. • A new external public lift
Timeline
- Completed: Award date1 November 2023
- Completed: Award published2 September 2024Current notice
- Completed: Contract expiry date30 April 2025
About the buyer
Brighton and Hove City Council buys as a local authority, with procurement staff spread across its many service departments rather than one central team. Tender and quotation opportunities are advertised through South East Shared Services, with lower-value contracts also listed on Contracts Finder. A quick quotes tool on South East Shared Services handles competitive bidding for smaller contracts. Smaller purchases go through competitive written quotes, while larger contracts move to open tendering. Construction contractors are drawn from the ConstructionLine database, and the council keeps separate approved lists for adult social care and children's services.
UK local government drives £140bn in annual procurement, led by social protection (£66.6bn) and education (£57.1bn).
Over the past 5 years, most of Brighton and Hove City Council's contract awards have been in education and training, construction work and health and social work.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@brighton-and-hove-city-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@brighton-and-hove-city-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@brighton-and-hove-city-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@brighton-and-hove-city-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@brighton-and-hove-city-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@brighton-and-hove-city-council.gov |
314 similar open tenders
See more open tenders related to BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor.
- Open tender
Interim Capital Programme
- Open tender
Major Works 2027
- Open tender
Footway Slurry Seal 2027
Related topics
Topics related to BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor, ranked by notice volume.
- 54,862£5.5tn
- 11,484£1.0tn
- 32,425£2.0tn
Related buyers
Buyers similar to Brighton and Hove City Council.
- 1,582£16.5bn
- 1,380£1.6bn
- 1,054£3.2bn
- 1,000£1.8bn
- 887£2.0bn
- 838£900.5m
- 829£388.9m
- 769£18.0bn
- 707£551.1m
- 625£2.4bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
