EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Mechanical Cooling System Package
Details
- Value
- £375,000
- Topic
- Electrical installation work
- Published
- 24 June 2024
- Submission
- 5 July 2024
- Source
- uk:contracts_finder
Tender description
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB are looking for a competent contractor to provide the mechanical cooling system. Duty sharing, cooling-only, and low wall-mounted indoor units are to be supplied for the MNO Comms room and HS2 Comms room A & B, while high wall-mounted indoor units are designated for Battery Room A & B. Each indoor unit must come equipped with complete mounting brackets and necessary accessories for installation within the designated rooms, along with condensate pipes and relevant fittings. Every indoor unit must be accompanied by a wall-mounted controller to regulate its operation within the respective room. The controller should feature a digital display that presents key operational functions of the indoor units, such as room temperature, setpoint temperature, programmable schedules, and other relevant information.
Timeline
- TenderThis notice (current page)
- Published
- 24 Jun 2024
- Deadline
- 5 Jul 2024
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
205 similar open tenders
See more open tenders related to Electrical installation work.
- Open tender
Ratoath Junior National School
- Open tender
Heating Services and Water Services
- Open tender
Electrical Services
- Open tender
Electrical and Lift Maintenance
Related topics
Topics related to EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Mechanical Cooling System Package, ranked by notice volume.
- 14,101£1.1tn
- 54,532£5.3tn
- 18,873£1.2tn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,957£786.0m
- 1,212£14.0bn
- 828£8.9bn
- 529£16.1bn
- 505£4.5bn
- 444£131.7m
- 413£2.0m
- 399£389.9m
- 326£346.3m
- 281£265.2m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.