8825 - DESIGN AND CONSTRUCTION OF ROSSLARE EUROPORT OFFSHORE RENEWABLE ENERGY (ORE) HUB
Details
- Topic
- Dredgers
- Published
- 14 May 2024
- Submission
- 25 July 2024
- Source
- ie:e_tenders
Tender description
Iarnród Eireann (IÉ) are seeking expressions of interest from suitably qualified applicants to participate in a tender competition for the design and construction of a proposed Offshore Renewable Energy (ORE) Hub at Rosslare Europort. Rosslare Europort is proposing the construction of port facilities which will be capable of facilitating fixed bottom wind farm projects in the Irish and Celtic Seas. Some of the key features of the proposed development are as follows: • Approximately 20 hectares of land reclamation from the sea at the westerly side of the existing Rosslare Europort; • Heavy lift berth (250m-330m in length) for accommodating ORE installation vessels; • Second berth (~240m long) for the delivery of foundation and wind turbine components; • Capital dredging works to the main berth pockets and approach channel; • Small boat harbour for local fishing vessels, Crew Transfer Vessels (CTV’s) and associated quayside facilities.
Timeline
- Completed: Tender published14 May 2024Current notice
- Completed: Submission date25 July 2024
About the buyer
Iarnród Eireann-Irish Rail operates Ireland's passenger and freight rail network as a subsidiary of CIÉ, with its own procurement department. Tenders are advertised on eTenders, the Irish government's official tendering platform. Procurement covers the goods, services and works needed to keep the network running safely. A Chief Civil Engineer oversees infrastructure works such as track, bridges and stations. Suppliers sign up to standard terms and conditions and a code of conduct set by the company. A published Sustainable Procurement Strategy, developed with the Supply Chain Sustainability School, shapes purchasing decisions across the business.
€29.5bn was the estimated value of contracts awarded across the Irish public sector in 2025.
Over the past 5 years, most of Iarnród Eireann-Irish Rail's contract awards have been in architectural and engineering services, transport equipment and construction work.
Relevant CPV codes
- 34513250 · Dredgers
- 45213300 · Buildings associated with transport
- 45213340 · Construction work for buildings relating to water transport
- 45213350 · Construction work for buildings relating to various means of transport
- 45241000 · Harbour construction works
- 63723000 · Berthing services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@iarnrod-eireann-irish-rail.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@iarnrod-eireann-irish-rail.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@iarnrod-eireann-irish-rail.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@iarnrod-eireann-irish-rail.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@iarnrod-eireann-irish-rail.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@iarnrod-eireann-irish-rail.gov |
9 similar open tenders
See more open tenders related to 8825 - DESIGN AND CONSTRUCTION OF ROSSLARE EUROPORT OFFSHORE RENEWABLE ENERGY (ORE) HUB.
- Open tender
Seskin Lisdowney Ballyconra GWS
- Open tender
Grimsby River Terminal – Civils Package
- Open tender
Fenit Pier Structural Repairs
- Open tender
Berths 9-10-11 Construction, Montrose Port
- Open tender
DPS
- Open tender
MAINTENANCE DREDGING WORKS AT FOYNES HARBOUR
Related topics
Topics related to 8825 - DESIGN AND CONSTRUCTION OF ROSSLARE EUROPORT OFFSHORE RENEWABLE ENERGY (ORE) HUB, ranked by notice volume.
- 4,446£798.4bn
Related buyers
Buyers similar to Iarnród Eireann-Irish Rail.
- 50£39.2m
- 38£1.5bn
- 9—
- 1£1.7m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
