- Value
- £1,750,000
- Topic
- Construction structures and materials; auxiliary products to construction (except electric apparatus)
- Published
- 8 January 2024
- Submission
- 19 January 2024
- Source
- uk:contracts_finder
Tender description
The works are for the provision of all people, equipment, plant and materials, charges, and insurances necessary for the supply, delivery, installation, testing for the following activities described below but not limited to: - Preparation of ground including to earthworks, excavation, dig and replace any temporary works associated to excavations. - All Interfacing works with piles for foundation works (Pile cropping, pile cap, ground beams and other elements) - Structural element blinding concrete, formworks, reinforcement, in-situ concrete works and all associated methods and testing - Structural element related to the ground slab including all starter bars and kickers - (precast element provision to be incorporated in construction) - All waterproofing elements - All buried services below slab to be included in the works (drainage, electrical and comms ducts, gas relieve pipes) - Earthing and Bonding connection cable to reinforcement and connection points through slabs - Preparation and submission of documentation for works ITP, RAMS, QRPs, Programme and any documentation required to deliver the works. Additional information: Required start date mid-2024
Timeline
- Completed: Tender published8 January 2024Current notice
- Completed: Submission date19 January 2024
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Contracts above the public procurement threshold are advertised on Find a Tender, and smaller awards appear on Contracts Finder. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain. Live subcontract opportunities are advertised through the CompeteFor portal.
Procurement spend from central entities makes up 66% of overall UK public spend.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Relevant CPV codes
- 44000000 · Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45000000 · Construction work
- 45112000 · Excavating and earthmoving work
- 45112500 · Earthmoving work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
343 similar open tenders
See more open tenders related to BBV HS2 MWCC North - P3 Groundworks.
- Open tender
BCU-ITT-64155 - Mold Dental Decontamination
- Open tender
HAR6126 Rushmead Construction
- Open tender
Bolton Urban Cricket Centre
- Open tender
HAR6126 Rushmead Construction
Related topics
Topics related to BBV HS2 MWCC North - P3 Groundworks, ranked by notice volume.
- 14,525£1.1tn
- 54,807£5.5tn
- 2,792£691.7bn
- 32,397£2.0tn
- 23,783£1.8tn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 3,058£1.8bn
- 1,201£14.2bn
- 807£8.9bn
- 553£22.8bn
- 487£3.8bn
- 430£24.8m
- 376£413.9m
- 302£335.8m
- 293£10.2bn
- 274£703.8m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.