Design, Supply and Install of a Materials Recovery Facility (MRF)
Details
- Topic
- Waste-treatment plant construction work
- Published
- 6 May 2024
- Source
- uk:sell2wales
Tender description
CWM Environmental (“The Purchaser”) is seeking to procure a turnkey contract for the design, supply, construction, installation, testing and commissioning of a material recovery facility (MRF) (the “Plant”). The Plant shall be capable of processing 20,000 tonnes per annum of kerbside collected Dry Mixed Recyclables (“Household DMR”), and 6,000 tonnes per annum of Commercial and Industrial recyclables (“C&I DMR”). The MRF shall be installed within an existing newly constructed building envelope (“the Facility”), supplied by The Purchaser and will be located at the Purchaser’s waste management site in Carmarthenshire, South Wales, SA32 8BG. CWM is responsible for processing both household and household-like C&I DMR arising within Carmarthenshire and neighbouring counties. DMR is currently received co-mingled and requires sorting into its component parts suitable for further recycling. In the future Carmarthenshire County Council will switch to a source-segregated collection of DMR, at which time the plant will switch to process smaller volumes of co-mingled material received from multi-occupancy buildings and neighbouring counties, alongside a mix of plastic containers, plastic film, metal containers and aseptic containers (such as Tetra Pak). Paper, card and other pre-separated materials will require baling only, with an option to process if required. NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=141204.
Timeline
- Completed: Tender published6 May 2024Current notice
About the buyer
CWM Environmental Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45222100 · Waste-treatment plant construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@cwm-environmental-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@cwm-environmental-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@cwm-environmental-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@cwm-environmental-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@cwm-environmental-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@cwm-environmental-ltd.gov |
1 similar open tenders
See more open tenders related to Design, Supply and Install of a Materials Recovery Facility (MRF).
Related topics
Topics related to Design, Supply and Install of a Materials Recovery Facility (MRF), ranked by notice volume.
- 16,656£1.3tn
Related buyers
Buyers similar to CWM Environmental Ltd.
- 895£120.1bn
- 564£3.2bn
- 355£645.8m
- 202£1.3bn
- 185£257.6m
- 179£1.8bn
- 174£806.2m
- 154£403.1m
- 151£202.4m
- 143£238.0m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
