Asset Operation Maintenance and Response Framework
Details
- Buyer
- Supplier(s)
- CORMAC
- Value
- £600,000
- Topic
- Works for complete or part construction and civil engineering work
- Published
- 3 April 2024
- Source
- uk:find_a_tender
Tender description
The Environment Agency have established a Framework Agreement that will be utilised for the following requirements: -<br/>-Civil Engineering projects;<br/>-Mechanical Electrical Instrumentation Control and Automation projects;<br/>-Vegetation Management programmes;<br/>-Landscape and Habitat Creation Implementation and Establishment Aftercare; and<br/>-Asset Operation and Incident Response activities<br/><br/>The duration of the Framework is three years (36 months) with one optional one-year (12 month) extension (totalling fours years or 48 months).<br/><br/>The total estimated value of the Framework based on a four year (48 month) duration is between £500,000,000.00 - £600,000,000.00. <br/><br/>The Environment Agency does not guarantee any level of work under this Framework Agreement. Lot 1: The Environment Agency have established a Framework Agreement that will be utilised for the following requirements: -<br/>-Civil Engineering projects;<br/>-Mechanical Electrical Instrumentation Control and Automation projects;<br/>-Vegetation Management programmes;<br/>-Landscape and Habitat Creation Implementation and Establishment Aftercare; and<br/>-Asset Operation and Incident Response activities<br/><br/>The framework has 3 lots. This modification applies to lot 1 only
Timeline
- Completed: Award date4 March 2024
- Completed: Award published3 April 2024Current notice
About the buyer
The Environment Agency is an executive non-departmental public body sponsored by Defra, and buys as a central agency for flood risk, water quality and pollution control. Flood and coastal risk schemes are delivered mainly through the Collaborative Delivery Framework, alongside frameworks for mapping, modelling and property flood resilience. These frameworks run through a central contract management system. Commercial oversight sits with Defra Group Commercial, alongside the Environment Agency's own project teams.
Over the past 5 years, most of the Environment Agency's contract awards have been in construction work, architectural and engineering services and research and development.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@environment-agency.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@environment-agency.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@environment-agency.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@environment-agency.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@environment-agency.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@environment-agency.gov |
73 similar open tenders
See more open tenders related to Works for complete or part construction and civil engineering work.
- Open tender
Claureen Link Road Phase 1
- Open tender
Lough Carra GWS – A4 Contractor Procurement
- Open tender
Exeter Main Operating Base
- Open tender
National Framework For Medium Works 2027
- Open tender
Chilton Grove
- Open tender
Frimley Lodge Car Park Project
Related topics
Topics related to Asset Operation Maintenance and Response Framework, ranked by notice volume.
- 55,662£5.5tn
- 1,623£73.2bn
Related buyers
Buyers similar to Environment Agency.
- 2,956£753.8m
- 1,203£13.7bn
- 547£16.2bn
- 505£4.2bn
- 445£130.8m
- 400£385.2m
- 379£1.8m
- 324£340.8m
- 288£10.2bn
- 281£263.7m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.