HS2 Euston Station - Site Wide Logistics Package
Details
- Supplier(s)
- Clipfine Ltd
- Value
- 5,000,000
- Duration
- 2 years
- Topic
- Siteworks
- Published
- 9 September 2021
- Source
- uk:contracts_finder
Tender description
Mace Dragados are seeking expressions of interest from Subcontractors to undertake the full Site Wide Logistics Package. The scope of the package consists of but is not limited to the following services/works: 1. Logistics Management (including deliveries to site) 2. Management of all vehicle movements to and from the Project from the point of site access to the point of site egress. 3. Provision of a Site Wide experienced and competent Logistics Manager 4. Provision of Site Equipment 5. General Traffic Management 6. Provision and management of minor civil/builders work 7. Radio Communications 8. Pedestrian Walkways, Barriers, Site Signage and Handrails 9. Provision of Fire Marshalls, Fire Points and Extinguishers 10. Operating the Delivery Management system 11. Interface with Security Subcontractor 12. Waste Management Works shall be contracted under NEC3 Engineering Construction Subcontract terms and conditions (with project specific amendments) Suppliers must have extensive demonstrable experience of delivering similar complex packages on previous projects of a similar scale on large major infrastructure projects. This experience must be applicable and relevant to the respective lots listed. If successful selected suppliers will be required to go through Mace Dragados pre-qualification process to be included on the final tender list. Mace Dragados have been appointed as the Construction Partner to build a fully-integrated HS2 station at London Euston, together with links to the existing London Underground station. HS2 Phase One includes construction of a new railway line run from London Euston to new stations at Old Oak Common in West London, an Interchange Station near Birmingham Airport and the National Exhibition Centre (NEC) and a terminus station in Birmingham City Centre (Curzon Street).
Timeline
- Awarded contractThis notice (current page)
- Published
- 9 Sep 2021
- Award
- 27 Aug 2021
- End
- 2 Jan 2024
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
3 similar open tenders
See more open tenders related to Siteworks.
Related topics
Topics related to HS2 Euston Station - Site Wide Logistics Package, ranked by notice volume.
- 1,356£60.0bn
- 4,155£84.3bn
- 16,161£1.2tn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,946£782.9m
- 1,206£14.0bn
- 817£8.9bn
- 528£16.1bn
- 502£4.5bn
- 443£131.8m
- 422£2.0m
- 397£434.8m
- 326£346.3m
- 281£20.2bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.