EV Charge Point Support & Maintenance Services
Details
- Buyer
- Network Rail
- Value
- £16,400,000
- Topic
- Battery chargers
- Published
- 5 February 2025
- Submission
- 14 March 2025
- Source
- uk:find_a_tender
Tender description
Network Rail is undertaking a Decarbonisation and Energy Efficiency Programme to transition towards sustainable and energy-efficient operations. This procurement is for the provision of maintenance services for Network Rail’s electric vehicle (EV) charging infrastructure, ensuring optimal uptime, operational reliability, and scalability to support the electrification of Network Rail’s fleet. The contract covers preventive and corrective maintenance, including scheduled servicing, diagnostics, and rapid fault resolution for both AC and DC charge points. It also includes warranty management, spare parts provisioning, and seamless integration with Network Rail’s future Charge Point Management System (CPMS) for real-time monitoring, fault detection, and predictive maintenance analytics (procured separately and out of scope of this procurement). The supplier must demonstrate multi-brand maintenance capability, as the network consists of chargers from multiple OEMs, including Schneider, Kenpower, and Rolec, alongside chargers managed by third parties such as APCOA. The network will expand from 1,000 chargers in Year 1 (currently up to 300 chargers are in operation) to approximately 8,600 chargers by Year 5, with a long-term target of 10,000 charge points. The procurement aligns with Network Rail’s sustainability and operational strategy, ensuring a cost-effective, scalable, and high-quality maintenance framework that supports fleet electrification, decarbonisation targets, and long-term infrastructure resilience. The selected supplier must provide innovative, data-driven maintenance solutions, incorporating remote diagnostics, predictive analytics, and sustainable servicing practices to optimise performance and reduce environmental impact. Lot 1: This procurement seeks to ensure the long-term reliability, scalability, and operational efficiency of Network Rail’s expanding EV charging infrastructure. The contract will provide preventive and corrective maintenance services to support the growth of the charging network from an estimated 1,000 chargers in Year 1 (currently operating up to 300 chargers) to 8,600 chargers by Year 5, with a projected total of 10,000 chargers by the end of the contract term. The contract includes preventive maintenance (PM) and corrective maintenance (CM) services, covering both AC and DC chargers from multiple OEMs (e.g., Schneider, Kenpower, Rolec). Preventive maintenance will involve scheduled inspections, cleaning, calibration, firmware updates, and proactive monitoring to optimise performance and extend charger lifespan. Corrective maintenance will provide rapid fault resolution, minimising downtime in accordance with strict Service Level Agreements (SLAs). This will ensure high operational availability. Suppliers will be required to integrate seamlessly with Network Rail’s future Charge Point Management System (CPMS), which provides real-time performance monitoring, automated fault detection, and predictive analytics capabilities. The supplier must demonstrate the ability to leverage CPMS data for proactive issue resolution, optimise maintenance schedules, and provide detailed reporting on charger performance trends and fault trends. The scope of the contract includes: • Comprehensive Maintenance Services: Full lifecycle support for AC and DC EV charge points, ensuring continuous and efficient operation. • Scalable Maintenance Framework: The ability to support a rapidly growing network, expanding from 1,000 chargers in Year 1 to over 8,600 by Year 5, with a long-term projection of up to 10,000 chargers. • Performance Management & SLAs: Compliance with strict response and resolution times for critical and non-critical faults, ensuring minimal disruption to Network Rail’s fleet operations. • Spare Parts & Warranty Management: Effective spare parts provisioning, including warranty coordination with OEMs. • Integration with CPMS: The supplier must align maintenance activities with real-time monitoring, fault detection, and automated reporting through Network Rail’s CPMS. • Sustainability & Innovation: Adoption of eco-friendly maintenance practices, waste minimisation, and deployment of advanced tools such as predictive analytics and remote diagnostics to enhance operational efficiency. • Nationwide Coverage: The supplier must provide uniform service delivery across all urban, rural, and remote locations, ensuring consistent uptime and performance across the Network Rail estate. Additional information: In order to express an interest and download the procurement documentation you must register with the NR Bravo system at the address listed: https://networkrail.bravosolution.co.uk/
Timeline
- Completed: Tender published5 February 2025Current notice
- Completed: Submission date14 March 2025
About the buyer
Network Rail runs a safe, efficient railway, and buys as a central public body split between a national Route Services team and its regional routes. Network Rail's latest spend reporting covers Control Period 7, the 2024-25 financial year.
Safety-critical work needs audited status on RISQS, the rail industry's supplier qualification scheme, before Network Rail contracts directly.
Over the past 5 years, most of Network Rail's contract awards have been in IT services, architectural and engineering services and construction work.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@network-rail.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@network-rail.gov |
23 similar open tenders
See more open tenders related to Battery chargers.
- Open tender
Energy Management Solutions Dynamic Market
- Open tender
Supply of DSP 27 Battery Carrier Spare Parts
- Open tender
Maintenance and Response 2 Framework
- Open tender
Internet of Things
- Open tender
Flexibility Services
Related topics
Topics related to EV Charge Point Support & Maintenance Services, ranked by notice volume.
- 2,557£223.2bn
- 5,920£788.7bn
- 11,526£1.0tn
- 27,791£1.7tn
- 328£5.0bn
- 3,612£45.5bn
Related buyers
Buyers similar to Network Rail.
- 1,895£372.1bn
- 511£247.2m
- 437£12.4bn
- 407£110.0m
- 393£653.2m
- 320£1.3bn
- 278£3.0bn
- 151£1.0bn
- 127£1.7bn
- 127£560.5m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.