Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface
Details
- Topic
- Installation services of steam generators, turbines, compressors and burners
- Published
- 5 April 2025
- Source
- uk:birminghamuniversity
Tender description
The University of Birmingham invites tenders for the Replacement of Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface. <br /><br />The current Waste Heat Boiler panel was built in 1990/91 and controls the operation of a water tube boiler that utilizes the exhaust from a Solar Mercury 50 gas turbine. The exhaust heat enables the university to generate 3500Kg/hr of saturated steam @ 17barG although the boiler is rated at 25barG. There is a supplementary burner within the boiler that can fire from 0.2barG natural gas to 3.5barG which allows the flexibility of the boiler range between 3500Kg to 18000Kg an hour, therefore providing a base load during the winter months.<br /><br />Please refer to Appendix A and associated appendices for the full specification of requirments available via www.intendhost.com/universityofbirmingham <br /><br />The works are to be completed by September 2025.<br /><br />Site visits are essential. These will be arranged via the correspondence feature on the InTend e-procurement portal.
Timeline
- Completed: Tender published5 April 2025Current notice
About the buyer
University of Birmingham is a higher education organisation whose central Procurement Division buys on behalf of its colleges, departments and professional services. Framework agreements arranged through regional consortia set fixed terms, service levels and pricing, and a purchase is committed only once an order is placed. The University also runs its own Build Higher Framework for construction projects, appointing five approved contractors to deliver against it. Suppliers register on the University's in-tend portal to view and respond to live tenders. Sustainable procurement principles apply across all University purchasing, covering carbon reduction and ethical supply chains.
Education procurement reached £47.4bn in 2024/25, the fourth-largest public sector budget.
Over the past 5 years, most of University of Birmingham's contract awards have been in business services, software and information systems and research and development.
Relevant CPV codes
- 51130000 · Installation services of steam generators, turbines, compressors and burners
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@university-of-birmingham.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@university-of-birmingham.gov |
Related topics
Topics related to Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface, ranked by notice volume.
- 4,422£257.4bn
Related buyers
Buyers similar to University of Birmingham.
- 428£28.9m
- 324£341.8m
- 159£192.4m
- 146£19.6m
- 138£360.3m
- 137£98.7m
- 117£28.7m
- 114£47.1m
- 103£22.2m
- 97£18.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
