Qualify and approach Milford Haven Port Authority effectively with insights on open tenders, recent contract awards, upcoming contract expiries, decision-maker contacts, and key supplier relationships.
The Port of Milford Haven invites you to submit a Proposal for the supply of an XL port bin / sea bin to collect approximately 1,000 litres of waste with an extra large waste bag, to be used in the Milford Fish Docks to assist with collecting plastic and ...
The project consists of the renovation and refurbishment of three Grade II listed annex buildings and the demolition and reconstruction of one annex building located within Gate 1, Pembroke Port, to create commercial workshop and office accommodation. The...
The Port of Milford Haven wishes to appoint a specialist Civil Engineering Consultancy team to prepare detailed designs on the basis of a single point of responsibility, for full design team services and construction supervision under the terms of an NEC3...
The Port of Milford Haven wishes to appoint a specialist Civil Engineering Consultancy team to prepare detailed designs on the basis of a single point of responsibility, for full design team services and construction supervision under the terms of an NEC3...
The Access Infrastructure and Timber Pond Infill project is a key part of the Pembroke Dock Marine Development and will specifically include the construction of the following elements:
1) A new supersize access slipway; and
2) A new workboat berthing faci...
The Access Infrastructure and Timber Pond Infill project is a key part of the Pembroke Dock Marine Development and will specifically include the construction of the following elements: 1) A new supersize access slipway, and 2) A new workboat berthing faci...
The Port of Milford Haven wishes to develop Milford Waterfront into a vibrant new destination. The Quay Stores development is a project designed to restore and transform the vacant, redundant, semi-derelict Grade II listed Quay Stores, located centrally i...
The Port of Milford Haven wishes to develop Milford Waterfront into a vibrant new destination. The Quay Stores development is a project designed to restore and transform the vacant, redundant, semi-derelict Grade II listed Quay Stores, located centrally i...
The Access Infrastructure and Timber Pond Infill project is a key part of the Pembroke Dock Marine Development and will specifically include the construction of
the following elements:
1) A new supersize access slipway, and
2) A new workboat berthing faci...
The Port of Milford Haven wishes to appoint a specialist Civil Engineering Consultancy team to prepare detailed designs on the basis of a single point of responsibility, for full design team services and construction supervision under the terms of an NEC3...
Milford Haven Port Authority (the Employer) wish to appoint a suitable Contractor to undertake landscape management works to remove habitat and potential hibernacula, in advance of further engineering works at Pembroke Dock. The site is approximately 4 ac...
The Access Infrastructure operation is a key part of the Pembroke Dock Marine Project and will specifically include:
1) A new supersize access slipway, and
2) A new workboat berthing facility.
The Port now intends to appoint a specialist Marine Consultanc...
The access infrastructure operation is a key part of the Pembroke Dock Marine Project and will specifically include:
1) a new supersize access slipway: and
2) a new workboat berthing facility.
The Port now intends to appoint a specialist marine consultanc...
The Access Infrastructure project is a key part of the Pembroke Dock Marine Development and will specifically include the construction of
the following:
1) A new supersize access slipway, and
2) A new workboat berthing facility.
The Port will shortly be a...
MHPA wishes to appoint consultants to provide project management and quantity surveying services for three elements of the Pembroke Dock Marine Project from the design stage through to project delivery.
The Port of Milford Haven has prepared a development...
The site is located in the small town of Pembroke Dock,in west Wales, about 4 km north west of Pembroke. The area to be investigated is part of Pembroke Port and is located just east of Carr Jetty, approximately 1.3 km west of Pembroke Dock railway statio...
The Port of Milford Haven wishes to appoint a supplier to enter into a fuel supply agreement.
MHPA wishes to appoint a fuel supplier to enter into a ‘Service Level Agreement’ for the supply of gas oil and other fuel types to sites in Milford Haven and Pem...
The Port of Milford Haven invites proposals for the provision of monitoring and evaluation services for 3 separate elements of the proposed Pembroke Dock Marine development:
1) Pembroke Dock Building adaptations;
2) Access infrastructure and additional be...
The Port of Milford Haven seeks to appoint a consultant to carry out monitoring and evaluation activities in relation to the Redevelopment of Quay Stores, Milford Haven, Pembrokeshire.
The appointed consultant will be required, as part of the evaluation, ...
Under the European Maritime and Fisheries Fund which supports added value for fisheries products and improvements to shore based facilities MHPA proposes to carry out alterations to the existing toilet block known as the Fish Merchants Toilets, this will ...
Provision of architectural consultancy services for the Quay Stores Building, Milford Haven, Pembrokeshire. (Planning to application stage through to practical completion).
Full architectural services for the redevelopment of Quay Stores, Milford Haven, P...
The Port of Milford Haven seeks to appoint a consultant to carry out monitoring and evaluation activities in relation to the Redevelopment of Quay Stores, Milford Haven, Pembrokeshire.
The appointed consultant will be required, as part of the evaluation, ...
Decision-maker contacts
Access contact information of executives and project sponsors and build relationships with public sector buyers that matter