Awarded contract

Published

AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027

57 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

539,910 GBP

Current supplier

Cleansing Service Group Ltd

Description

Aster Group has approximately 76 foul water infrastructure assets (Sewage Treatment Plants, septic tanks and pumping stations) serving homes not connected to mains drainage. There is an ongoing requirement to undertake routine maintenance of the foul water assets to ensure correct operation and compliance with Environment Agency discharge consents along with the emptying of septic tanks to provide effluent disposal arrangements for properties served by the installations. This procurement is for the successor arrangement to the current contract which comes to an end in early 2025. The requirement is for the provision of scheduled maintenance, non-scheduled maintenance works (where instructed) and provision of a provision of 24-hour, 365-day out of hours and emergency call out service. Full details of the requirements are set out in the Procurement Documents. Lot 1: Lot 1 - North Hampshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 2: Lot 2 - South Hampshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 3: Lot 3 - East Dorset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 4: Lot 4 - West Dorset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 5: Lot 5 - Devon & Cornwall The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 6: Lot 6 - Somerset The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents. Lot 7: Lot 7 – Wiltshire The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

London Borough of Islington

2,000 GBP

Published a day ago

London Borough of Islington

9,300 GBP

Published a day ago

Regional Business Services Organisation Procurement and Logistics Service

5,825,000 GBP

Published 2 days ago

Cardiff Community Housing Association (CCHA)

Published 5 days ago

Thirteen Housing Group Ltd

523,520 GBP

Published 5 days ago

Muirhouse Housing Association

Published 5 days ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.