Design and build geothermal infrastructure for the UK Geoenergy Observatory at Cuningar Loop, Glasgow, UK

Published

Description

Short description: The British Geological Survey (BGS) and the Natural Environment Research Council (NERC) are constructing a mine water geothermal research facility on the Cuningar Loop in east Glasgow as part of the UK Geoenergy Observatories project (from now on referred to as the ‘Glasgow Observatory’). Both NERC and BGS form a part of the UK Research and Innovation (UKRI). The tender is for the procurement of a supplier to provide the design and build support to BGS (the Client) in delivery of the geothermal infrastructure for the Glasgow Observatory. The Contractor’s main responsibilities will include but are not limited to: detailed design and construction of the works; testing and commissioning the works. The supplier shall be appointed under an NEC4 ECC Lot 1: The supplier will develop the ‘Detailed Design Specification’ through collaboration with the Client, to deliver an engineering design for the bespoke research infrastructure that meets the science requirements within the specified budget. Assuming the design is accepted, the supplier will build the design such that the facility is ‘research-ready’. The geothermal infrastructure will comprise (but may not be limited to) the following: 1. Extend four of the mine-water borehole wellheads above ground level and construct a low brick wellhead chamber and associated pipework. 2. To complete the hydraulic and thermal design of a pumping main and reinjection main, associated manual valve work and other infrastructure. To excavate and install this pipe infrastructure in trenches. 3. To install a cable duct within the main pipework trench to be routed to a control panel at a heat centre at Site 1. 4. To select and install an electrical submersible pump, associated cabling and rising main in boreholes GGA05 and GGA07. Consideration should be given to the termination and support of these items through the upper wellhead flanged plate. A suitable valve arrangement and wellhead sensors are also to be incorporated into the design. 5. To design and install a reinjection main in boreholes GGA01 and GGA08, with a corresponding pressure-tight wellhead upper-flanged plate. A suitable valve arrangement and wellhead sensors are also to be incorporated into the design. 6. To install two access tubes in all four boreholes, one of which shall be installed with a sensor to determine and log downhole water head, temperature and electrical conductivity. 7. The well equipment and pipework shall be selected to deliver a variable flow rate up to a maximum of 12 L/s and down to a minimum of 3 L/s, while maintaining a positive gauge pressure of at least 1 bar throughout the entire pumping-heat exchange-reinjection main system. 8. The wellhead flange plates should be designed to accommodate both a reinjection main and a pump rising main in the future. 9. To select and install a “heat centre” within the Site 1 compound. 10. To select and install a reversible water-air chiller / heat pump adjacent to the heat centre, with a nominal maximum output of 200 kW in both heating and cooling mode. 11. To design and install a heat exchanger circuit in the heat centre. The circuit should include three equally-sized shell-and-tube heat exchangers with a combined heat exchange capacity of 200 kW. 12. To design and install an insulated heat transfer fluid circuit connecting the heat exchangers to the heat pump / chiller unit, with temperature and pressure sensors, circulation pump, glycol pressure regulation and top-up equipment, any necessary thermal buffering, and a sampling tap for sampling the glycol. 13. To install monitoring equipment within the heat centre on the mine water circuit to include an electromagnetic flowmeter, chemical dosing pump, temperature, pressure and electrical conductivity sensors, and a sampling tap. 14. To equip the heat centre with a control panel / management system for receiving and logging signals from the various installed sensors, and also sending control signals to the submersible pumps and the heat pump/chiller. 15. To prepare full design, installation, operation and maintenance documentation for the infrastructure installed in this Contract. 16. To prepare a maintenance schedule for the facility. 17. Commission, test and demonstrate the facility. 18. To providing training on operating the system.

Timeline

Publish date

3 years ago

Award date

3 years ago

Buyer information

UK Research & Innovation

Contact:
Kate Richardson
Email:
kate.richardson@ukri.org

Explore contracts and tenders relating to UK Research & Innovation

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by UK Research & Innovation

Explore more open tenders, recent contract awards and upcoming contract expiries published by UK Research & Innovation.

Explore more suppliers to UK Research & Innovation

Sign up