Stotles logo

Pre-tender

Published

NICC Group Training Simulator

17 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Description

The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System. The GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles. The GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site. The Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. As the GTS is not being used for training on the operational technology systems themselves, it is not required to provide a precise simulation/emulation of the individual systems. However, the GTS must provide a sufficient level of fidelity to the live operational systems so that meaningful training can be accomplished with a reasonable level of authenticity – e.g., the system should at least appear as close as possible to the real system and not introduce any confusion to operators during training. The GTS is entirely separate from the operational technology systems and has no connection with them, though there will be some connectivity with corporate IT systems for the purposes of passing training and competence assessment data generated within the GTS to other associated HS2 IT systems. There will therefore need to be some consideration of, and compliance with, HS2 cyber security standards and provisions as part of design and deployment. The GTS needs to be deployed to the GTF within the NICC and the assigned rooms mentioned earlier, noting that the Instructor workstation furniture will form part of the envisaged scope of supply for the GTS, whereas trainee workstations are already provisioned through a contract with another supplier. Further detail is available with the Market Sounding Briefing Document available from Paul Markham, Procurement Category Manager - paul.markham@hs2.org.uk Lot 1: The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System. The GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles. The GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site. The Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. The GTS provides multiple trainers with suitable user interfaces to manage, control, monitor, participate in (role play) and evaluate the various training sessions. Additionally it allows trainers to create, modify and manage a library of scenarios that can be used to drive the GTS simulation sessions to behave in the desired manner. The GTS is expected to come pre-populated with some scenarios developed collaboratively with HS2 – and used as part of testing and acceptance activities - but others will be created by HS2 training staff as operational experience of the railway in service accumulates and demands for new scenarios arise. Included within the provision of the GTS will be voice, video and screen recording and playback facilities so that trainers and trainees can review training sessions where appropriate to enhance learning and feedback opportunities. Additional information: Please capture your response using the Microsoft Forms page which can be found here: https://forms.office.com/Pages/ResponsePage.aspx?id=_kLg78_Ea06o1CMjTGnF7CTcGToghJhHoICn1pNvz-9UOVdYMElQV0JDSjZVSklCQUZGVUdZOFZGNi4u If you wish to participate in the market sounding exercise, please submit a response via the above mentioned link by no later than 28th February 2025 at 16:00 (4pm GMT).

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Crown Commercial Service

24,270,000 GBP

Published 12 days ago

Kingdom Housing Association Ltd

Published a month ago

Kingdom Housing Association Ltd

Published a month ago

Animal and Plant Health Agency

Published 2 months ago

Oxleas NHS Foundation Trust

35,000 GBP

Published 2 months ago

University of Strathclyde

350,000 GBP

Published 2 months ago

University of Strathclyde

350,000 GBP

Published 2 months ago

Dumfries and Galloway Council

Published 2 months ago

Dumfries and Galloway Council

Published 2 months ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.