Stotles logo

Tenders & contracts relating to Rolling stock

Find Rolling stock opportunities in seconds below. Search through thousands of Rolling stock open tenders, recent contract awards and upcoming contract expiries. Bookmark the tender and begin your bidding process with Stotles.

Manage tenders relating to Rolling stock in seconds with Stotles.

Start for free

Rolling stock tenders & contracts

  • Awarded

    Published 5 years ago

    Luas Operations and Maintenance Contract

    Luas is Dublin's light rail system and consists of two lines, the Red Line and the Green Line. The system currently comprises 37 kilometres of track, two maintenance depots, 54 stops and a fleet of 66 light rail vehicles. Luas carried 34 million passeng...

  • Awarded

    Published 5 years ago

    Railway transport services

    time-iconExpiry date: 11/05/2025

    The scope of the Luas Operations and Maintenance (O&M) contract will include the following to be performed by the operator: operation of public light rail passenger services, rolling stock maintenance, infrastructure maintenance (e.g. depots, track, etc.)...

  • Awarded

    Published 5 years ago

    Railway and tramway passenger coaches, and trolleybuses

    The procurement of the operation of ‘Registered Local Bus services’ in the Gateshead, Sunderland, South Tyneside and Newcastle local authority areas of the Tyne and Wear boundary with effect from 21.7.2019. It is anticipated that subsequent contracts will...

  • Get alerts on Rolling stock tenders & contracts straight to your inbox

    Sign up free
  • Awarded

    Published 5 years ago

    Railway maintenance or service vehicles, and railway freight wagons

    price-tag-icon1,100,000 GBP

    Supply of Wagon Drawgears. Supply of wagon drawgears.

  • Awarded

    Published 5 years ago

    Railway carriages

    price-tag-icon200,000 GBPtime-iconExpiry date: 07/03/2020

    Translink require a competent economic operator to design, manufacture and supply at-seat power systems (USB sockets) across the CAF Class 3000 (C3K) fleet. Your proposal Must be submitted within the eTendersNI portal, via this CfT. no other method of sub...

  • Awarded

    Published 5 years ago

    Railway carriages

    time-iconExpiry date: 06/03/2020

    Translink require a competent economic operator to design, manufacture and supply internal LED Lighting across the CAF Class 3000 (C3K) fleet. Your proposal must be submitted within the eTendersNI portal, via this CfT. No other method of submission will b...

  • Awarded

    Published 5 years ago

    Railway maintenance or service vehicles, and railway freight wagons

    Supply, operation and maintenance of direct operated fleet consisting of dynamic tamping and ballast regulators. Supply, operation and maintenance of direct operated fleet consisting of dynamic tamping and ballast regulators.

  • Awarded

    Published 6 years ago

    Railway maintenance or service vehicles, and railway freight wagons

    price-tag-icon705,790 GBP

    This is a contract for bogie repair, wheelset overhaul and wheel re-profiling for the current Subway rolling stock fleet to Wabtec Rail Ltd. This is for the award of a contract for bogie repair, wheelset overhaul and wheel re-profiling for the current Sub...

  • Awarded

    Published 6 years ago

    Lighting equipment and electric lamps

    price-tag-icon4,700,000 GBPtime-iconExpiry date: 24/08/2042

    This procurement is for the design, manufacture and supply of Saloon LED Lighting for Central Line and Waterloo and City Line 1992 Tube Stock (TS). This procurement is for the design and manufacture of Saloon LED Lighting System for London Underground’s C...

  • Awarded

    Published 6 years ago

    Railway passenger coaches

    time-iconExpiry date: 19/08/2021

    Translink require a competent Economic Operator to deliver the provision of train cleaning staff to fulfil the requirements as detailed within this Call for Tender (CfT). The Economic Operator will be required to provide staff to cover 7 days/nights each ...

  • Awarded

    Published 6 years ago

    Rolling Stock Re-Railing and Heavy Lifting Equipment

    The Chief Mechanical Engineers (CME) department of Iarnród Éireann (IÉ) would like to purchase a complete set of hydraulically operated rolling stock re-railing equipment. IÉ are seeking modern, lightweight, reliable and compact equipment already proven ...

  • Awarded

    Published 6 years ago

    Manufacture, Supply and Delivery onto the UK rail network of 16/24-off FNA Nuclear Flask Rail Wagons

    time-iconExpiry date: 31/03/2018

    Manufacture, Supply and Delivery onto the UK rail network of 16/24-off FNA Nuclear Flask Rail Wagons. Please see OJEU notice: 2017/S 183-376095

  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed