Awarded contract

Published

DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME

8 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

5,097,611.91 GBP

Current supplier

DAWSON-WAM

Description

The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals. Lot 1: The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Moray Council

2,645,154.77 GBP

Published 18 hours ago

Welsh Government

Published 8 days ago

London Borough of Haringey

94,397.61 GBP

Published 9 days ago

Bristol City Council

67,307.85 GBP

Published 13 days ago

The City of Edinburgh Council

126,542,550 GBP

Published 13 days ago

Ministry of Defence

16,659,313.5 GBP

Published 14 days ago

Cambridgeshire County Council

181,270.51 GBP

Published 15 days ago

Creating Enterprise C.I.C

10,534,506.64

Published 15 days ago

London Borough of Haringey

61,108.33 GBP

Published 16 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.