Awarded contract
Published
Stepping Stones Nature Reserves 22/23
46 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Current supplier
Tegfan Groundworks
Description
An award has been made by the Countryside & Wildlife Team of Neath Port Talbot Council to appoint the services of a contractor to conduct ground works and installation on several sites. This groundwork is different per site, as described in the contract specification. It includes removal of large areas of tarmac, using the tarmac to create hibernacula, fence removal/ installation, installing benches & interpretation lecterns, etc.The contractors will also place new porous pathing in the form of stepping stones on some sites. Project Timescale:- Contract Specification:- Site 1. Tollgate Park Installation of one interpretation panel lectern with integrated bug hotel sourced by council. Site 2a. Goytre Close Removal of ~380m2 of tarmac from site, with the creation of a hibernacula mound recycling some of the tarmac, and soil removed for path installation. The rest to be safely removed from site and adhering to Environmental Safety standards. Installation of one interpretation panel lectern with integrated bug hotel sourced by council. Porous material stepping stone pathway ~51m to be created around site, the soil removed for this is to be used to cover the hibernacula pile. The creation of a compost bin with inbuilt bug hotel features for insects and gaps for wildlife such as reptiles. The installation of a bench made from recycled plastic. Site 2b. Goytre Close Cemetery Creation/installation of a standing bug hotel with interpretation panel lectern based of an existing design present at Gnoll Country Park. Site 3. Talbot Park Removal of ~721m2 of tarmac from site, with the creation of a bee bank using some tarmac, soil recycled from path creation, and sand. Specifics for the bee bank include creating a crescent shaped mound facing South/South East, with a clifflet created. See appendices. Porous material stepping stone pathway ~62m to be created around site, the soil removed for this is to be used to create bee bank. Excess to be removed. Removal and reinstallation of benches on the site. Installation of one interpretation panel lectern with integrated bug hotel sourced by council. Site 4. Flowerbed by Civic Centre Removal of vegetation and ground scraping ready for planting. Site 5. Crymlyn Park Installation of lectern panel.
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Bridgnorth Town Council
470,572.14 GBP
Published 3 days ago
London Borough of Camden
344,724.14 GBP
Published 3 days ago
London Borough of Camden
320,990.5 GBP
Published 5 days ago
Moray Council
18,000,000 GBP
Published 10 days ago
Moray Council
18,000,000 GBP
Published 10 days ago
Hampshire County Council
76,894.42 GBP
Published 10 days ago
SP TRANSMISSION PLC
2,400,000,000 GBP
Published 10 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.