North Campus - Industry Hub
Published
Buyer
Value
Description
This project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements. The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information. The Works will be instructed in two phases: • Phase 1 being the delivery of the infrastructure and landscaping package only; and • Phase 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building. The proposed works noted under Phase 2, notably the construction of the new Industry Hub building will be dependent upon a successful funding applications. Lot 1: In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension. The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known. Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings. Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College. At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct. The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus. There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature. Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond. The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023. The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT. The College has procured Project Team and Design Services to complete up to RIBA Stage 4. The following Design Disciplines are proposed to be novated to the Principal Contractor. • Architect (lead Designer) - ABW Architects • Landscape Designer - Milieu Landscape Design • Civil & Structural Engineering Consultants - Waterman Group. Lot 1: In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension. The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known. Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings. Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College. At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct. The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus. There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature. Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond. The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023. The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT. The College has procured Project Team and Design Services to complete up to RIBA Stage 4. The following Design Disciplines are proposed to be novated to the Principal Contractor. • Architect (lead Designer) - ABW Architects • Landscape Designer - Milieu Landscape Design • Civil & Structural Engineering Consultants - Waterman Group.
Timeline
Publish date
a year ago
Close date
a year ago
Buyer information
Burnley College
- Contact:
- Stuart Arnfield
- Email:
- newbuildtender@burnley.ac.uk
Explore contracts and tenders relating to Burnley College
Go to buyer profileNotice topic
Source
"Find-a-Tender"To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
NCC1397 Bellingham Groundworks, Roads & Sewers
Advance Northumberland Limited1,400,074 GBPPublished today
- Openclosing
Construction of play park, cafe and car park
Eckington Parish Council1,050,000 GBPPublished today
- Openclosing
Beechwood Close Retaining Wall, Bowness-on-Windermere
Westmorland and Furness Council150,000 GBPPublished today
- Openclosing
CA13997 - Tender 04/2024 - Preparatory Works & Provision of Sand to Foreshore at Warrenpoint Baths
Newry Mourne and Down District Council15,000 GBPPublished today
- Openclosing
Minor Works Services (for schemes up to £1m ex vat)
North Eastern Universities Purchasing Consortium (NEUPC)40,000,000 GBPPublished today
- Openclosing
Provision of YMCA Refurbishment / Upgrade Works
Barnsley Metropolitan Borough Council1,800,000 GBPPublished today
Explore other contracts published by Burnley College
Explore more open tenders, recent contract awards and upcoming contract expiries published by Burnley College.
- Closed
Architectural, construction, engineering and inspection services
Burnley College500,000,000 GBPPublished 4 years ago
- Closed
Burnley College - Supply, Installation and Management of a Total Print Solution
Burnley College600,000 GBPPublished 5 years ago
- Closed
Burnley College - Supply, Installation and Management of a Total Print Solution
Burnley College600,000 GBPPublished 5 years ago
Explore more suppliers to Burnley College
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Cumbria County Council
- Met Office
- Cambridge City Council
- NI Water
- Arts Council England
- Ordnance Survey
- Clarion Housing Group
- West Kent Housing Association
- Police and Crime Commissioner for Devon and Cornwall
- FOODBUY EUROPE LIMITED
- Ministry of Defence, Ships, Salvage and Marine Operations (S&MO)
- Saint Cecilia's Church of England School
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.